Skip to main content
Detached backyard ADU with wood siding and black-framed glass doors at dusk
Sunland-Tujunga, California

ADUs & Additions in Sunland-Tujunga

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for Sunland-Tujunga properties

Sunland-Tujunga fills the northeast corner of the San Fernando Valley between the San Gabriel and Verdugo mountains, and its early character was set by Bolton Hall, the community center the Little Landers colony raised in 1913 from stone gathered in the Tujunga Wash. The same abundant fieldstone produced a number of Tujunga houses in the late 1910s and 1920s, from stone bungalows built on load-bearing stone walls instead of wood framing to a cubic, parapeted style unique to the town. Beyond the flat center the ground rises into the foothills, and much of that foothill land falls under the San Gabriel/Verdugo Mountains Scenic Preservation Specific Plan, with its own rules on oaks, ridgelines and planting. A backyard here starts with three checks: the slope, the fire map and whether the lot sits inside that plan.

Mostly low-density single-family. Postwar tracts on the gently sloping ground at the foot of the San Gabriels hold modest parcels, about 0.15 acre on Amanita Avenue and about 0.20 acre around Marnice Avenue, while the hillside Haines Canyon tract has irregular lots of roughly 0.4 to 0.85 acre set into the slope. Inside the Specific Plan, 20,000 square feet, about 0.46 acre, is where the oak rule begins and the single-family exemption ends, so lot size shapes a project as much as grade does.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Sunland-Tujunga: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Nearly all of Sunland-Tujunga, its flat center included, lies inside the City's mapped Hillside Grading Area, so a pool here also needs its own LADBS grading permit. Much of the foothill ground on both sides of the valley falls inside the San Gabriel/Verdugo Mountains Scenic Preservation Specific Plan (Ordinance No. 175,736), where LADBS may not issue a building or grading permit for a Project, a term that includes any grading that needs a grading permit, until City Planning grants Project Permit Compliance. A single-family home on an existing site under 20,000 square feet, outside a Prominent Ridgeline Protection Area and any Equinekeeping District, falls outside the plan's definition of a Project, so it skips that review but must still meet the plan's ridgeline-silhouette rule where it applies and its prohibited-plant list. On plan-area lots of 20,000 square feet or more, a coast live oak or valley oak of eight inches or more, measured 4.5 feet above the ground, cannot be removed, cut down or moved without prior written approval from City Planning, and palms, Italian cypress, blue gum eucalyptus, California and Brazilian pepper trees, fountain grass and pampas grass are among the plants prohibited in new Projects.

Permit details checked September 2026 against LADBS and LA City Planning. Rules change, so we confirm them again for your parcel.

What We Build

  • Specific Plan Project Permit Compliance review
  • Oak protection and plan-compliant planting palettes
  • Hillside grading permits and retaining walls
  • Additions to load-bearing stone houses
  • Fire-zone materials and wind-engineered shade structures
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Sunland-Tujunga actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Sunland-Tujunga projects.

01

The generally flat center gives way to San Gabriel and Verdugo foothill slopes, where homes such as those on Haines Canyon Avenue sit into the hillside above masonry retaining walls and stone or brick stairs, so structure and drainage lead the build.

02

Long stretches of Oro Vista Avenue in Sunland and the hillside blocks of Haines Canyon and Hillhaven avenues in Tujunga are mapped Very High Fire Hazard Severity Zone on the City's fire hazard map, which shapes material and planting choices around a pool or outdoor room.

03

All of Sunland-Tujunga lies in the City's mapped High Wind Area, and in March 1956 winds of 85 to 100 miles per hour drove a wildfire that engulfed seven homes in the then-new Manzanita Slopes tract on Haines Canyon Avenue, so pergolas and shade structures deserve real wind engineering.

04

Some of Tujunga's late-1910s and 1920s stone houses were built with load-bearing stone walls rather than wood framing, so an addition or a new opening in one of them is a structural question before it is a design one.

Areas we serve in Sunland-Tujunga:SunlandTujungaOld TujungaHaines CanyonMarnice Avenue

Investment

What this costs in Sunland-Tujunga

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Sunland-Tujunga property

How We Build

Your Sunland-Tujunga project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Sunland-Tujunga that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Sunland-Tujunga Questions

Common questions from Sunland-Tujunga homeowners

Who issues the permits for this work in Sunland-Tujunga?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Nearly all of Sunland-Tujunga, its flat center included, lies inside the City's mapped Hillside Grading Area, so a pool here also needs its own LADBS grading permit. Much of the foothill ground on both sides of the valley falls inside the San Gabriel/Verdugo Mountains Scenic Preservation Specific Plan (Ordinance No. 175,736), where LADBS may not issue a building or grading permit for a Project, a term that includes any grading that needs a grading permit, until City Planning grants Project Permit Compliance. A single-family home on an existing site under 20,000 square feet, outside a Prominent Ridgeline Protection Area and any Equinekeeping District, falls outside the plan's definition of a Project, so it skips that review but must still meet the plan's ridgeline-silhouette rule where it applies and its prohibited-plant list. On plan-area lots of 20,000 square feet or more, a coast live oak or valley oak of eight inches or more, measured 4.5 feet above the ground, cannot be removed, cut down or moved without prior written approval from City Planning, and palms, Italian cypress, blue gum eucalyptus, California and Brazilian pepper trees, fountain grass and pampas grass are among the plants prohibited in new Projects. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Sunland-Tujunga different?

Mostly low-density single-family. Postwar tracts on the gently sloping ground at the foot of the San Gabriels hold modest parcels, about 0.15 acre on Amanita Avenue and about 0.20 acre around Marnice Avenue, while the hillside Haines Canyon tract has irregular lots of roughly 0.4 to 0.85 acre set into the slope. Inside the Specific Plan, 20,000 square feet, about 0.46 acre, is where the oak rule begins and the single-family exemption ends, so lot size shapes a project as much as grade does. One local condition that shapes the work: The generally flat center gives way to San Gabriel and Verdugo foothill slopes, where homes such as those on Haines Canyon Avenue sit into the hillside above masonry retaining walls and stone or brick stairs, so structure and drainage lead the build.

Which parts of Sunland-Tujunga do you work in?

All of it, including Sunland, Tujunga, Old Tujunga and Haines Canyon. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Sunland-Tujunga?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in Sunland-Tujunga?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054