
ADUs & Additions in Altadena
Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.
ADUs & Additions built for Altadena properties
Working in an unincorporated community changes the whole process: there is no city hall, and every approval routes through County departments that each review a different part of the plan. We spend real time up front on zoning under the Altadena Community Standards District, wildland-interface construction requirements, and site conditions on lots that may have burned. Deep parcels and mountain backdrops still make this one of the best places we build outdoor space.
Lots are unusually deep for the region — often 8,000 to 15,000 square feet with genuine room for a detached structure — and grade uphill toward the mountains as you move north.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.
Permits in Altadena: Altadena is unincorporated, so building permits are issued by the County's Building and Safety Division rather than any city, with land-use and zoning review by the Los Angeles County Department of Regional Planning plus clearances from County Fire and Public Health. Submittals run through the County's EpicLA portal, and there is a County Building and Safety office and One-Stop Permit Center on West Woodbury Road serving Eaton Fire rebuilds. Development standards come from County Code Title 22 and the Altadena Community Standards District, which governs the size and scale of new and expanded structures and addresses hillside management areas. Much of the north side is mapped Very High Fire Hazard Severity Zone.
What We Build
- County One-Stop Permit Center coordination
- Wildfire-resistant exterior construction
- Community Standards District compliance
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-storey additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in Altadena actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Altadena projects.
Foothill parcels sit on steep alluvial and debris-flow deposits below the Angeles National Forest, so grading, drainage, and retaining engineering carry more weight than on valley-floor sites.
Fire-affected lots frequently need soil testing, removal of compromised foundations, and re-established utility services before any new structure, pool, or detached unit is set.
Wildland-interface construction dictates ignition-resistant vents, eaves, siding, glazing, and decking materials on new and replacement work.
Surviving mid-century houses commonly have original electrical services and clay sewer laterals that must be upgraded before pool equipment or a second dwelling can be energized.
Investment
What this costs in Altadena
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
How We Build
Your Altadena project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Altadena that submittal goes to Los Angeles County Department of Public Works, Building and Safety Division.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
Altadena Questions
Common questions from Altadena homeowners
Who issues the permits for this work in Altadena?
Los Angeles County Department of Public Works, Building and Safety Division. Altadena is unincorporated, so building permits are issued by the County's Building and Safety Division rather than any city, with land-use and zoning review by the Los Angeles County Department of Regional Planning plus clearances from County Fire and Public Health. Submittals run through the County's EpicLA portal, and there is a County Building and Safety office and One-Stop Permit Center on West Woodbury Road serving Eaton Fire rebuilds. Development standards come from County Code Title 22 and the Altadena Community Standards District, which governs the size and scale of new and expanded structures and addresses hillside management areas. Much of the north side is mapped Very High Fire Hazard Severity Zone. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.
What makes building in Altadena different?
Lots are unusually deep for the region — often 8,000 to 15,000 square feet with genuine room for a detached structure — and grade uphill toward the mountains as you move north. In practice that means foothill parcels sit on steep alluvial and debris-flow deposits below the Angeles National Forest, so grading, drainage, and retaining engineering carry more weight than on valley-floor sites..
Which parts of Altadena do you work in?
All of it, including Janes Village, Country Club Park, The Meadows, La Viña. We are based in Los Angeles at Cahuenga Pass, so Altadena is a short run for our crews rather than a job we service from out of the area.
What does adus & additions cost in Altadena?
Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
More services in Altadena
Altadena Guides
Planning guides for Altadena homeowners
Costs, materials and process notes from our own projects.
ADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Maths in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guideSecond Storey Addition vs Building Out: Which Costs Less
Building out runs $350 to $500 per square foot. Going up runs $450 to $700. Here is when the cheaper option is actually the wrong one, and what drives each number.
Read guidePlanning adus & additions in Altadena?
Sit down with your project manager, go through the details, and get an accurate estimate for your property.
Licensed & Insured · LIC #1119054
