ADUs & Additions project in Pasadena, California
Pasadena, California

ADUs & Additions in Pasadena

Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.

ADUs & Additions built for Pasadena properties

We work across a city where two houses on the same street can carry completely different rulebooks — one inside a landmark district, one on a hillside lot with slope limits. Our teams plan around the Arroyo's cobble soils, protected oaks, and driveways built for Model Ts. Before design starts we confirm zoning overlay, tree inventory, and fire-zone status, because those three items shape a pool, ADU, or addition far more than square footage does.

Parcels range from compact 6,000-square-foot bungalow lots near the historic districts to half-acre and larger estate grounds in Oak Knoll and the San Rafael hills. Rear yards are often deep but narrow, with alley or single-drive access.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.

Permits in Pasadena: Residential permits are issued through the Permit Center of the Building & Safety Division, with entitlements and design review handled inside the same Planning & Community Development Department. Lots in the city's Hillside Overlay Districts require a Hillside Development Permit under Zoning Code Chapter 17.29. Properties inside a landmark district or individually designated need a Certificate of Appropriateness evaluated against the Secretary of the Interior's Standards. The Tree Protection Ordinance (PMC 8.52) requires a permit before removing protected trees, including native oaks over eight inches in diameter, and northern foothill parcels fall inside a Very High Fire Hazard Severity Zone.

What We Build

  • Hillside Development Permit packages
  • Certificate of Appropriateness submittals
  • Protected-tree preservation plans
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-storey additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Pasadena actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Pasadena projects.

01

Arroyo-side and foothill lots sit on coarse alluvial fan deposits, so excavation for pools and sunken patios often hits cobble and boulder layers that slow digging and raise export costs.

02

The Raymond Fault crosses the southern edge of town, and parcels inside the state-mapped Alquist-Priolo zone need a fault investigation before new habitable structures can be sited.

03

Craftsman-era blocks were platted before cars grew, leaving single-width driveways and detached rear garages that force smaller equipment, hand-dig zones, or crane picks for pool shells.

04

Mature deodar and oak canopy shades many rear yards, which changes pool solar gain, drives root-protection fencing, and limits where a spa or detached unit foundation can land.

Areas we serve in Pasadena:Bungalow HeavenMadison HeightsLinda VistaSan Rafael HillsHastings RanchOak Knoll

Investment

What this costs in Pasadena

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

How We Build

Your Pasadena project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Pasadena that submittal goes to City of Pasadena Planning & Community Development Department, Building & Safety Division.

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Pasadena Questions

Common questions from Pasadena homeowners

Who issues the permits for this work in Pasadena?

City of Pasadena Planning & Community Development Department, Building & Safety Division. Residential permits are issued through the Permit Center of the Building & Safety Division, with entitlements and design review handled inside the same Planning & Community Development Department. Lots in the city's Hillside Overlay Districts require a Hillside Development Permit under Zoning Code Chapter 17.29. Properties inside a landmark district or individually designated need a Certificate of Appropriateness evaluated against the Secretary of the Interior's Standards. The Tree Protection Ordinance (PMC 8.52) requires a permit before removing protected trees, including native oaks over eight inches in diameter, and northern foothill parcels fall inside a Very High Fire Hazard Severity Zone. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.

What makes building in Pasadena different?

Parcels range from compact 6,000-square-foot bungalow lots near the historic districts to half-acre and larger estate grounds in Oak Knoll and the San Rafael hills. Rear yards are often deep but narrow, with alley or single-drive access. In practice that means arroyo-side and foothill lots sit on coarse alluvial fan deposits, so excavation for pools and sunken patios often hits cobble and boulder layers that slow digging and raise export costs..

Which parts of Pasadena do you work in?

All of it, including Bungalow Heaven, Madison Heights, Linda Vista, San Rafael Hills. We are based in Los Angeles at Cahuenga Pass, so Pasadena is a short run for our crews rather than a job we service from out of the area.

What does adus & additions cost in Pasadena?

Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning adus & additions in Pasadena?

Sit down with your project manager, go through the details, and get an accurate estimate for your property.

Licensed & Insured · LIC #1119054