ADUs & Additions in Ontario

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for Ontario properties

George and William B. Chaffey founded Ontario in 1882 as an irrigation colony, and its backbone was Euclid Avenue, a boulevard of twin roadways divided by a central mall that rises on a long, easy incline from the Southern Pacific tracks toward the mouth of San Antonio Canyon. The older city holds eight designated historic districts, where Craftsman bungalows stand near Mediterranean, Tudor and Victorian houses. To the south, the 13-square-mile Ontario Ranch occupies land the city annexed in 1999 from the former San Bernardino County Agricultural Preserve, where dairy farms had shaped the landscape since the early 1900s and are now giving way to master-planned neighborhoods. Beneath most of the city lies alluvial sand that the Safety Element treats as a wind-related hazard, so a backyard plan here weighs historic review, dust and wind during excavation, and exactly where a pool, its barrier fence and an ADU may sit on the lot.

Two eras share the city: the Chaffey brothers' original subdivision pattern, still intact around the historic downtown and Euclid Avenue, with early tracts such as College Park, subdivided into 48 lots in 1914, and Armsley Square, laid out in 1924, and Ontario Ranch to the south, where former dairy properties are being converted to master-planned neighborhoods. Development Code Table 6.01-1 sets the minimum traditional single-family lot at 18,000 square feet in the AR-2 district, 10,000 in RE-2 and RE-4, and 7,200 in LDR-5.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Ontario: Under the Development Code's residential standards, a pool, spa or pond 1.5 feet deep or more cannot be built in a front yard, must sit at least 3 feet from side and rear property lines and must be enclosed by a decorative nonclimbable fence or wall at least 5 feet high, while diving boards, slides, waterfalls and decorative rockscapes need at least 5 feet from side and rear lines. ADU applications go to the Building Department electronically through the city's Citizen Portal Access, and the city's ADU handout caps a detached unit at 850 square feet for a studio or one bedroom and 1,000 square feet for two or more, generally at 16 feet tall, with 4-foot side and rear setbacks and 6 feet of separation between detached structures. Exterior alterations to historic buildings, including homes in the city's eight designated historic districts, need a Certificate of Appropriateness reviewed by Planning staff, the Historic Preservation Subcommittee and the Historic Preservation Commission, or a Planning waiver for minor alterations.

Permit details checked September 2026 against City of Ontario. Rules change, so we confirm them again for your parcel.

What We Build

  • Pool setbacks and 5-foot barrier fencing
  • Certificate of Appropriateness review in historic districts
  • Wind and dust control during excavation
  • Detached ADU sizing and 6-foot structure separation
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Ontario actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Ontario projects.

01

The Safety Element describes the alluvial sand beneath most of Ontario as very susceptible to erosion, with strong winds driving it onto property, and its policies require dust-control best management practices on all excavation and grading and prohibit excavation and grading during strong wind conditions as defined by the Building Code, which brings the wind forecast into any dig schedule.

02

Because of the local topography and the nearby Cajon Pass, the Safety Element names Santa Ana winds as by far the city's greatest fire hazard, with increased risk in older portions of Ontario, although its 2025 CAL FIRE-based map shows no Fire Hazard Severity Zone inside city limits.

03

Much of the central and western city, roughly from Fourth Street south to Riverside Drive and west of Haven Avenue, lies inside the Safety Element's mapped zone of subsidence due to groundwater pumping, liquefaction is also listed among local hazards, and the city follows state guidelines and the California Building Code to decide when a project needs a geotechnical investigation.

04

Properties inside the Airport Influence Area of the LA/Ontario International Airport Land Use Compatibility Plan are subject to that plan's requirements under the Development Code, a check worth making alongside zoning before an addition or ADU is designed.

Areas we serve in Ontario:College ParkArmsley SquareRosewood CourtEl Morado CourtEuclid AvenueOntario Ranch

Investment

What this costs in Ontario

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Ontario property

How We Build

Your Ontario project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Ontario that submittal goes to City of Ontario Community Development, Building Department.

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Ontario Questions

Common questions from Ontario homeowners

Who issues the permits for this work in Ontario?

City of Ontario Community Development, Building Department. Under the Development Code's residential standards, a pool, spa or pond 1.5 feet deep or more cannot be built in a front yard, must sit at least 3 feet from side and rear property lines and must be enclosed by a decorative nonclimbable fence or wall at least 5 feet high, while diving boards, slides, waterfalls and decorative rockscapes need at least 5 feet from side and rear lines. ADU applications go to the Building Department electronically through the city's Citizen Portal Access, and the city's ADU handout caps a detached unit at 850 square feet for a studio or one bedroom and 1,000 square feet for two or more, generally at 16 feet tall, with 4-foot side and rear setbacks and 6 feet of separation between detached structures. Exterior alterations to historic buildings, including homes in the city's eight designated historic districts, need a Certificate of Appropriateness reviewed by Planning staff, the Historic Preservation Subcommittee and the Historic Preservation Commission, or a Planning waiver for minor alterations. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Ontario different?

Two eras share the city: the Chaffey brothers' original subdivision pattern, still intact around the historic downtown and Euclid Avenue, with early tracts such as College Park, subdivided into 48 lots in 1914, and Armsley Square, laid out in 1924, and Ontario Ranch to the south, where former dairy properties are being converted to master-planned neighborhoods. Development Code Table 6.01-1 sets the minimum traditional single-family lot at 18,000 square feet in the AR-2 district, 10,000 in RE-2 and RE-4, and 7,200 in LDR-5. One local condition that shapes the work: The Safety Element describes the alluvial sand beneath most of Ontario as very susceptible to erosion, with strong winds driving it onto property, and its policies require dust-control best management practices on all excavation and grading and prohibit excavation and grading during strong wind conditions as defined by the Building Code, which brings the wind forecast into any dig schedule.

Which parts of Ontario do you work in?

All of it, including College Park, Armsley Square, Rosewood Court and El Morado Court. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Ontario?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in Ontario?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054