Skip to main content
Detached backyard ADU with wood siding and black-framed glass doors at dusk
Corona, California

ADUs & Additions in Corona

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for Corona properties

Corona grew up around a circle. Civil engineer H.C. Kellogg turned founder R.B. Taylor's idea of a grand circular boulevard into Grand Boulevard, with a grid of streets enclosed inside it, and the loop hosted the Corona Road Races between 1913 and 1916, by which time the town was already known as the Lemon Capital of the World. The city has since added more than thirty specific plans, from Sierra Del Oro and Corona Ranch to Eagle Glen and Dos Lagos. On a backyard here the deciding questions are slope position, where the pool equipment can legally sit, and whether the parcel falls in a mapped fire hazard zone.

Two broad patterns: the original grid of streets enclosed by Grand Boulevard, and the later specific-plan communities, where development standards are set plan by plan. Slope position and fire hazard mapping vary from lot to lot, so both are checked before design starts.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, CSLB license #1119054.

Permits in Corona: The Building Division is one of four divisions in the Planning & Development Department, alongside Planning, Code Compliance and Development Services, and works from 400 South Vicentia Avenue on a Monday-through-Thursday schedule, closed Fridays. Plans are submitted and tracked through the city's eTRAKiT portal. The division's pool advisory requires Development Services and Planning approval before a pool goes to building plan check, structural plans prepared and stamped by a licensed architect or engineer, and a soils report wherever the Building Official calls for one; barbecue islands that include a sink also require plan review. Chapter 7A ignition-resistant construction applies in the mapped Very High Fire Hazard Severity Zone, the city's 2025 map update extends that standard to High zones once adopted, and applicants are asked to verify a parcel's zone before plan check.

Permit details checked September 2026 against City of Corona. Rules change, so we confirm them again for your parcel.

What We Build

  • Top-of-slope pool setback engineering
  • Equipment placement and sound wall detailing
  • Chapter 7A ignition-resistant specification
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Corona actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Corona projects.

01

A pool shell closer than seven feet to the top of a slope must be engineered to hold its water without soil support, and near the toe of a slope steeper than one in three the setback is a quarter of the slope height, so slope position often decides where a pool can sit.

02

Pumps and filters must stand at least ten feet from an adjoining property line unless a block wall at least five feet high, extending two feet past the equipment on each side, separates them from the neighbor, which drives equipment pad and sound wall placement.

03

Roughly 3,000 structures sit inside the city's Very High Fire Hazard Severity Zone and just over 14,000 more lie within half a mile of it, so venting, decking and cladding choices near the wildland edge are made with ember exposure in mind.

04

Staging sand or materials in the street during a pool build requires an encroachment permit from Development Services, and draining a pool or backwash to the sewer through a P-trap is prohibited without Utilities Department approval, so logistics and discharge are planned before excavation.

Areas we serve in Corona:Sierra Del OroCorona RanchMountain GateEagle GlenDos LagosSouth Corona

Investment

What this costs in Corona

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Corona property

How We Build

Your Corona project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Corona that submittal goes to City of Corona Planning & Development Department, Building Division.

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Corona Questions

Common questions from Corona homeowners

Who issues the permits for this work in Corona?

City of Corona Planning & Development Department, Building Division. The Building Division is one of four divisions in the Planning & Development Department, alongside Planning, Code Compliance and Development Services, and works from 400 South Vicentia Avenue on a Monday-through-Thursday schedule, closed Fridays. Plans are submitted and tracked through the city's eTRAKiT portal. The division's pool advisory requires Development Services and Planning approval before a pool goes to building plan check, structural plans prepared and stamped by a licensed architect or engineer, and a soils report wherever the Building Official calls for one; barbecue islands that include a sink also require plan review. Chapter 7A ignition-resistant construction applies in the mapped Very High Fire Hazard Severity Zone, the city's 2025 map update extends that standard to High zones once adopted, and applicants are asked to verify a parcel's zone before plan check. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Corona different?

Two broad patterns: the original grid of streets enclosed by Grand Boulevard, and the later specific-plan communities, where development standards are set plan by plan. Slope position and fire hazard mapping vary from lot to lot, so both are checked before design starts. One local condition that shapes the work: A pool shell closer than seven feet to the top of a slope must be engineered to hold its water without soil support, and near the toe of a slope steeper than one in three the setback is a quarter of the slope height, so slope position often decides where a pool can sit.

Which parts of Corona do you work in?

All of it, including Sierra Del Oro, Corona Ranch, Mountain Gate and Eagle Glen. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Corona?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in Corona?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed & insured · CSLB license #1119054