
ADUs & Additions in San Dimas
Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.
ADUs & Additions built for San Dimas properties
San Dimas rises from the hills around Via Verde and Bonelli Park, across a level town center, into the Northern Foothills, and its zoning still makes room for rural habits: on qualifying SF-A lots a household may keep horses, a few goats and sheep, and even a single young calf. On the hillside, the SF-H zone asks for the reverse of flat-land development, with houses designed to fit the landform rather than the landform regraded to fit the house, split-level plans, and landmark rock outcroppings and prominent trees left in place. Under the city's development plan rules, pools, spas, ADUs and matching one-story additions are approved at Planning Division staff level, while new homes and additions of more than one story go to the Director of Community Development. Knowing which zone a lot sits in, and how the fire hazard map treats it, is the first step of any design here.
Residential lots here fall under zones with very different rules. The SF-A agriculture zone permits horses on lots of 16,000 square feet or more, while in the SF-H hillside zone new subdivisions need at least 25,000 square feet of net lot area where the average slope is under 20 percent and a full acre at 20 percent or steeper, with a 140-foot minimum lot width and lot coverage capped at 35 percent.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.
Permits in San Dimas: Under Municipal Code Chapter 18.12, no building or structure may be built, altered or enlarged until its development plan has been reviewed and approved. Planning Division staff approve pools and spas (with or without retaining walls), ADUs and junior ADUs, and one-story additions designed to match the existing house; new homes, additions of more than one story, and patios, gazebos or ground-level decks that use cantilevers or retaining walls and are visible from a public right-of-way go to the Director of Community Development. The Director can send a staff-level project to a higher level of review when it could be incompatible with, or adversely affect, surrounding property. In the SF-H Single-Family Hillside Zone, a development plan must be approved before any grading or building, and grading or building permit applications there must include site plans, conceptual house elevations and grading plans.
Permit details checked September 2026 against San Dimas Municipal Code. Rules change, so we confirm them again for your parcel.
What We Build
- Staff-level development plan review for pools and ADUs
- SF-H grading plans and split-level terracing
- Corral setback planning on horse-zoned lots
- Ember-resistant detailing in foothill fire zones
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-story additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in San Dimas actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on San Dimas projects.
CAL FIRE's Local Responsibility Area map dated March 24, 2025 places much of the Northern Foothills, including the canyon terrain around Horsethief Canyon Park and the San Dimas Canyon Nature Center, in a Very High Fire Hazard Severity Zone, and the southern hills around Via Verde and Bonelli Park carry a mix of Very High, High and Moderate designations, while the level ground around downtown sits largely outside the mapped zones.
In the SF-H hillside zone, cuts and fills on housing sites, exposed or retained by walls, should not exceed twelve feet from toe to top, and exposed cut and fill slopes may be no steeper than 2:1, limits that favor stepped terraces over a single large graded pad.
Every SF-H development plan must show a patio or deck area on the hillside lot, formed by cut and fill, retaining walls or cantilevered decks, so the outdoor living space is located on the plans even if it is built later.
In the SF-A agriculture zone, horses are allowed on lots of at least 16,000 square feet, two per lot at that minimum size, and no part of a corral, box stall or stable may sit within 35 feet of a habitable structure on the same lot or within 80 feet of one on an adjacent lot, so additions and new living space have to be planned around the corral.
Investment
What this costs in San Dimas
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.
Get a line-item price for your San Dimas propertyHow We Build
Your San Dimas project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In San Dimas that submittal goes to City of San Dimas Community Development Department, Building and Safety Division.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
San Dimas Questions
Common questions from San Dimas homeowners
Who issues the permits for this work in San Dimas?
City of San Dimas Community Development Department, Building and Safety Division. Under Municipal Code Chapter 18.12, no building or structure may be built, altered or enlarged until its development plan has been reviewed and approved. Planning Division staff approve pools and spas (with or without retaining walls), ADUs and junior ADUs, and one-story additions designed to match the existing house; new homes, additions of more than one story, and patios, gazebos or ground-level decks that use cantilevers or retaining walls and are visible from a public right-of-way go to the Director of Community Development. The Director can send a staff-level project to a higher level of review when it could be incompatible with, or adversely affect, surrounding property. In the SF-H Single-Family Hillside Zone, a development plan must be approved before any grading or building, and grading or building permit applications there must include site plans, conceptual house elevations and grading plans. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.
What makes building in San Dimas different?
Residential lots here fall under zones with very different rules. The SF-A agriculture zone permits horses on lots of 16,000 square feet or more, while in the SF-H hillside zone new subdivisions need at least 25,000 square feet of net lot area where the average slope is under 20 percent and a full acre at 20 percent or steeper, with a 140-foot minimum lot width and lot coverage capped at 35 percent. One local condition that shapes the work: CAL FIRE's Local Responsibility Area map dated March 24, 2025 places much of the Northern Foothills, including the canyon terrain around Horsethief Canyon Park and the San Dimas Canyon Nature Center, in a Very High Fire Hazard Severity Zone, and the southern hills around Via Verde and Bonelli Park carry a mix of Very High, High and Moderate designations, while the level ground around downtown sits largely outside the mapped zones.
Which parts of San Dimas do you work in?
All of it, including Via Verde, Northern Foothills and Downtown San Dimas. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.
What does an ADU or addition cost in San Dimas?
Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
San Dimas Guides
Planning guides for San Dimas homeowners
Costs, materials and process notes from our own projects.
ADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Math in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guideSecond Story Addition vs Building Out: Which Costs Less
Building out runs $350 to $500 per square foot. Going up runs $450 to $700. Here is when the cheaper option is actually the wrong one, and what drives each number.
Read guidePlanning an ADU or addition in San Dimas?
Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.
Licensed, bonded & insured · CSLB license #1119054