
ADUs & Additions in Claremont
Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.
ADUs & Additions built for Claremont properties
Claremont's General Plan defines more than thirty distinct neighborhoods, from college campuses to foothill subdivisions, and the city's Architectural Design Guidelines describe many of them one by one. Historic Claremont, the oldest, sits south of Foothill Boulevard beside Pomona College and the Village, with homes built between the 1890s and the 1940s on a street grid where many garages are reached from alleys behind the houses. North of the 210 Freeway the pattern loosens into winding streets and larger lots, and above them the Claremont Hills Wilderness Park, established in 1997, has grown past 2,500 acres of protected hillside. That northern edge is also where the General Plan places the city's greatest fire hazard. In every district, new construction and site changes pass through design review, so a pool, a garden wall or a patio cover is judged on how it sits among its neighbors as well as how it lives.
Claremont's RS single-family districts set minimum lots of 8,000, 10,000, 13,000 or 20,000 square feet and cap lot coverage at 30 to 40 percent by district; covered patios and decks count toward that cap, as do uncovered decks more than three feet above grade, while pools and uncovered patios do not. In Historic Claremont, blocks often pair large corner houses with smaller homes and many lots carry guest houses or accessory dwelling units, while North and Northeast Claremont were laid out with winding streets, cul-de-sacs and larger lots with very deep setbacks.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.
Permits in Claremont: Building permits are issued by the Building Division of the Community Development Department, and under Municipal Code Chapter 16.300 no building permit is issued until any required design review has been approved. Section 16.300.030 routes pools, walls, fencing, grading, hardscape, patio structures and exterior changes to single-family homes through staff review, while exterior changes in the Historical Claremont and Arbol Verde districts go to the Architectural and Preservation Commission when the Director of Community Development finds they could have a substantial adverse visual impact. Pool permit applications need plans prepared by a licensed structural engineer with a wet signature and stamp, and in the Hillside District and the RS (20,000) district, which follows the same grading standards, any excavation or fill, or any cut or fill slope, over three feet in vertical height needs the Director's prior approval.
Permit details checked September 2026 against Claremont Municipal Code and City of Claremont. Rules change, so we confirm them again for your parcel.
What We Build
- Staff design review for pools, walls and patio covers
- Engineer-stamped pool plans and slope soils reports
- Hillside District grading approvals
- Defensible space and draft hydrant planning
- Parkway tree protection during construction
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-story additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in Claremont actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Claremont projects.
Pools must sit at least five feet from any structure, with the water line at least five feet from every property line and the pool at least twelve feet from overhead electrical wires unless they are safety cable. Plot plans must show filled ground and any slope within 25 feet of the pool or deck, and where fill or slopes are near the pool a soils report is required unless the City Engineer waives it.
Fire hazard concentrates in the north, where the General Plan places the city's greatest fire potential on undeveloped foothill land carrying chaparral, sage and grasses. Properties in High and Very High Fire Hazard Severity Zones receive Los Angeles County Fire Department defensible space inspections and brush clearance notices, and in the Very High zone the fire chief can require a new pool of 5,000 gallons or more to connect to a draft hydrant.
Storm runoff from Mount Baldy moves down canyons that open onto Claremont's alluvial plain, and where a pool could affect approved cross-lot drainage the City Engineer can require grading inspections before and after construction, detailed grading plans, a grading permit and a bond.
Trees within the City easement, which generally runs ten feet from the face of the curb, are City-owned. The municipal code bars impacting their drip line in ways that could damage roots or compact soil and requires guards around them during construction, which bears on staging and trenching near the street.
Investment
What this costs in Claremont
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.
Get a line-item price for your Claremont propertyHow We Build
Your Claremont project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Claremont that submittal goes to City of Claremont Community Development Department, Building Division.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
Claremont Questions
Common questions from Claremont homeowners
Who issues the permits for this work in Claremont?
City of Claremont Community Development Department, Building Division. Building permits are issued by the Building Division of the Community Development Department, and under Municipal Code Chapter 16.300 no building permit is issued until any required design review has been approved. Section 16.300.030 routes pools, walls, fencing, grading, hardscape, patio structures and exterior changes to single-family homes through staff review, while exterior changes in the Historical Claremont and Arbol Verde districts go to the Architectural and Preservation Commission when the Director of Community Development finds they could have a substantial adverse visual impact. Pool permit applications need plans prepared by a licensed structural engineer with a wet signature and stamp, and in the Hillside District and the RS (20,000) district, which follows the same grading standards, any excavation or fill, or any cut or fill slope, over three feet in vertical height needs the Director's prior approval. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.
What makes building in Claremont different?
Claremont's RS single-family districts set minimum lots of 8,000, 10,000, 13,000 or 20,000 square feet and cap lot coverage at 30 to 40 percent by district; covered patios and decks count toward that cap, as do uncovered decks more than three feet above grade, while pools and uncovered patios do not. In Historic Claremont, blocks often pair large corner houses with smaller homes and many lots carry guest houses or accessory dwelling units, while North and Northeast Claremont were laid out with winding streets, cul-de-sacs and larger lots with very deep setbacks. One local condition that shapes the work: Pools must sit at least five feet from any structure, with the water line at least five feet from every property line and the pool at least twelve feet from overhead electrical wires unless they are safety cable. Plot plans must show filled ground and any slope within 25 feet of the pool or deck, and where fill or slopes are near the pool a soils report is required unless the City Engineer waives it.
Which parts of Claremont do you work in?
All of it, including Historic Claremont, Old Claremont, Claraboya and North Claremont. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.
What does an ADU or addition cost in Claremont?
Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
Claremont Guides
Planning guides for Claremont homeowners
Costs, materials and process notes from our own projects.
ADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Math in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guideSecond Story Addition vs Building Out: Which Costs Less
Building out runs $350 to $500 per square foot. Going up runs $450 to $700. Here is when the cheaper option is actually the wrong one, and what drives each number.
Read guidePlanning an ADU or addition in Claremont?
Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.
Licensed, bonded & insured · CSLB license #1119054