Skip to main content
Open-plan living room and kitchen with polished concrete floors
Westchester, California

ADUs & Additions in Westchester

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for Westchester properties

Westchester sits on a broad coastal terrace between the bluffs above Ballona Creek and the LAX airfield, and that position explains most of what shapes a project here. Beneath the level blocks lie dense terrace sands, with groundwater far below the surface. The questions that matter most are rules rather than soil: Kentwood's tract restrictions and review committee, the city's hillside grading map near the bluffs, and the FAA notice rules for tall construction beside a major airport. A pool, a shaded outdoor room or a backyard ADU moves smoothly when those checks are settled before the design is final.

Most lots sit on the level top of the coastal terrace. The blocks near the northern bluffs and parts of Westport Heights and Loyola Village fall inside the Hillside Grading Area, and Kentwood lots are reviewed against the protective restrictions written for their tract and lot.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Westchester: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Parts of Westchester are mapped inside the city's Hillside Grading Area, including the blocks near the bluffs on the northern edge and parts of Westport Heights and Loyola Village, and a pool on a lot in that area needs its own LADBS grading permit. In Kentwood, some of the Kentwood Home Guardians' Declarations of Protective Restrictions contain architectural restrictions, so plans for exterior changes or an ADU go to the Kentwood Home Guardians Architectural Review Committee before any work begins. A decision is due within 30 days of a complete submittal, and no variances from those restrictions are approved. Because the whole neighborhood lies within 20,000 feet of LAX's runways, any construction or alteration that would rise above the FAA's 100-to-1 notification surface requires notice on FAA Form 7460-1 at least 45 days before construction starts or the building permit application is filed, whichever comes first.

Permit details checked September 2026 against LADBS, State of California and Federal regulations. Rules change, so we confirm them again for your parcel.

What We Build

  • Kentwood architectural review submittals
  • Hillside Grading Area pool permits
  • FAA Part 77 height screening near LAX
  • Bluff-edge geotechnical coordination
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Westchester actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Westchester projects.

01

Westchester is built on a broad terrace 100 to 150 feet above sea level, where older alluvial deposits are locally capped by a veneer of old, largely stabilized dune sand, and deep borings describe dense to very dense sands and silty sands.

02

Groundwater is deep beneath the terrace, and its dense older deposits were left out of the state liquefaction zone, which follows the Ballona Creek lowlands below.

03

The steep erosional bluffs along Westchester's northwestern edge fall inside a state earthquake-induced landslide zone, so a pool or deck near the bluff is best planned with a geotechnical engineer's input.

Areas we serve in Westchester:KentwoodWestport HeightsLoyola Village

Investment

What this costs in Westchester

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Westchester property

How We Build

Your Westchester project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Westchester that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Westchester Questions

Common questions from Westchester homeowners

Who issues the permits for this work in Westchester?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Parts of Westchester are mapped inside the city's Hillside Grading Area, including the blocks near the bluffs on the northern edge and parts of Westport Heights and Loyola Village, and a pool on a lot in that area needs its own LADBS grading permit. In Kentwood, some of the Kentwood Home Guardians' Declarations of Protective Restrictions contain architectural restrictions, so plans for exterior changes or an ADU go to the Kentwood Home Guardians Architectural Review Committee before any work begins. A decision is due within 30 days of a complete submittal, and no variances from those restrictions are approved. Because the whole neighborhood lies within 20,000 feet of LAX's runways, any construction or alteration that would rise above the FAA's 100-to-1 notification surface requires notice on FAA Form 7460-1 at least 45 days before construction starts or the building permit application is filed, whichever comes first. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Westchester different?

Most lots sit on the level top of the coastal terrace. The blocks near the northern bluffs and parts of Westport Heights and Loyola Village fall inside the Hillside Grading Area, and Kentwood lots are reviewed against the protective restrictions written for their tract and lot. One local condition that shapes the work: Westchester is built on a broad terrace 100 to 150 feet above sea level, where older alluvial deposits are locally capped by a veneer of old, largely stabilized dune sand, and deep borings describe dense to very dense sands and silty sands.

Which parts of Westchester do you work in?

All of it, including Kentwood, Westport Heights and Loyola Village. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Westchester?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in Westchester?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054