
ADUs & Additions in Manhattan Beach
Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.
ADUs & Additions built for Manhattan Beach properties
Small lots, big ambitions. A classic Sand Section parcel is thirty feet by ninety — 2,700 square feet — with three-foot side setbacks, so a plunge pool, a spa, a roof deck and a stair tower all have to be resolved as one three-dimensional puzzle. Walk-street addresses have no vehicle frontage at all, which makes staging and material handling a design decision. We plan the coastal permit and the crane pick together.
Tight and rectangular near the beach — commonly around 30 by 90 feet with three-foot side setbacks — with larger, steeply sloped view parcels up the hill and wider conventional lots inland.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.
Permits in Manhattan Beach: Building permits are issued by the Building and Safety Division of the City's Community Development Department, with applications accepted through the Citizen Self Service portal. Manhattan Beach has a certified Local Coastal Program, so the City itself issues Coastal Development Permits under the Coastal Development Permit Procedures chapter of that program, and certain decisions remain appealable to the California Coastal Commission. Coastal Zone projects that add floor area, alter exterior elevations, or add decks and roof decks generally require that permit in addition to the building permit. Plan review here covers architectural, structural, geotechnical, grading and drainage, energy and fire life safety, so timing varies with scope.
What We Build
- Coastal Development Permit submittals
- Shoring and caisson design in sand
- Crane and walk-street logistics
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-storey additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in Manhattan Beach actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Manhattan Beach projects.
Loose beach sand and dune deposits across much of the west side require engineered shoring, and often caissons, before excavation for a basement, pool or equipment vault.
Walk-street properties have no vehicle frontage, so gunite, steel, spoil and finish materials move by hand, conveyor or crane from an adjoining street.
Persistent salt air corrodes fasteners, equipment housings and unprotected metal, pushing specification toward marine-grade hardware and coated components.
Hill Section parcels fall steeply from street to rear, so outdoor living stacks vertically across decks and terraces instead of spreading out.
Investment
What this costs in Manhattan Beach
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
How We Build
Your Manhattan Beach project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Manhattan Beach that submittal goes to City of Manhattan Beach Community Development Department, Building and Safety Division.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
Manhattan Beach Questions
Common questions from Manhattan Beach homeowners
Who issues the permits for this work in Manhattan Beach?
City of Manhattan Beach Community Development Department, Building and Safety Division. Building permits are issued by the Building and Safety Division of the City's Community Development Department, with applications accepted through the Citizen Self Service portal. Manhattan Beach has a certified Local Coastal Program, so the City itself issues Coastal Development Permits under the Coastal Development Permit Procedures chapter of that program, and certain decisions remain appealable to the California Coastal Commission. Coastal Zone projects that add floor area, alter exterior elevations, or add decks and roof decks generally require that permit in addition to the building permit. Plan review here covers architectural, structural, geotechnical, grading and drainage, energy and fire life safety, so timing varies with scope. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.
What makes building in Manhattan Beach different?
Tight and rectangular near the beach — commonly around 30 by 90 feet with three-foot side setbacks — with larger, steeply sloped view parcels up the hill and wider conventional lots inland. In practice that means loose beach sand and dune deposits across much of the west side require engineered shoring, and often caissons, before excavation for a basement, pool or equipment vault..
Which parts of Manhattan Beach do you work in?
All of it, including Sand Section, Tree Section, Hill Section, El Porto. We are based in Los Angeles at Cahuenga Pass, so Manhattan Beach is a short run for our crews rather than a job we service from out of the area.
What does adus & additions cost in Manhattan Beach?
Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
More services in Manhattan Beach
Manhattan Beach Guides
Planning guides for Manhattan Beach homeowners
Costs, materials and process notes from our own projects.
Manhattan Beach Backyard Costs on a 30-by-90 Lot
A Manhattan Beach ground-level yard runs $40,000 to $120,000 and a plunge pool $85,000 to $140,000. Access, sandy soil compaction, salt-air materials and roof-deck loads explained.
Read guideADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Maths in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guidePlanning adus & additions in Manhattan Beach?
Sit down with your project manager, go through the details, and get an accurate estimate for your property.
Licensed & Insured · LIC #1119054
