Plans, Permits & Design project in Manhattan Beach, California
Manhattan Beach, California

Plans, Permits & Design in Manhattan Beach

Architectural drawings, structural engineering, Title 24 and full permit management. Designed, permitted and built by our own crews.

Plans, Permits & Design built for Manhattan Beach properties

Small lots, big ambitions. A classic Sand Section parcel is thirty feet by ninety — 2,700 square feet — with three-foot side setbacks, so a plunge pool, a spa, a roof deck and a stair tower all have to be resolved as one three-dimensional puzzle. Walk-street addresses have no vehicle frontage at all, which makes staging and material handling a design decision. We plan the coastal permit and the crane pick together.

Tight and rectangular near the beach — commonly around 30 by 90 feet with three-foot side setbacks — with larger, steeply sloped view parcels up the hill and wider conventional lots inland.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.

Permits in Manhattan Beach: Building permits are issued by the Building and Safety Division of the City's Community Development Department, with applications accepted through the Citizen Self Service portal. Manhattan Beach has a certified Local Coastal Program, so the City itself issues Coastal Development Permits under the Coastal Development Permit Procedures chapter of that program, and certain decisions remain appealable to the California Coastal Commission. Coastal Zone projects that add floor area, alter exterior elevations, or add decks and roof decks generally require that permit in addition to the building permit. Plan review here covers architectural, structural, geotechnical, grading and drainage, energy and fire life safety, so timing varies with scope.

What We Build

  • Coastal Development Permit submittals
  • Shoring and caisson design in sand
  • Crane and walk-street logistics
  • Measured surveys and existing-condition drawings
  • Architectural plan sets for permit submittal
  • Structural engineering coordination
  • Title 24 energy compliance documentation
  • ADU and addition planning packages
  • Pool, hardscape and structure permits
  • Soils and geotechnical report coordination
  • HOA architectural review submissions
  • City submittal and plan-check correction responses
  • Inspection scheduling and sign-off

Local Conditions

What building in Manhattan Beach actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Manhattan Beach projects.

01

Loose beach sand and dune deposits across much of the west side require engineered shoring, and often caissons, before excavation for a basement, pool or equipment vault.

02

Walk-street properties have no vehicle frontage, so gunite, steel, spoil and finish materials move by hand, conveyor or crane from an adjoining street.

03

Persistent salt air corrodes fasteners, equipment housings and unprotected metal, pushing specification toward marine-grade hardware and coated components.

04

Hill Section parcels fall steeply from street to rear, so outdoor living stacks vertically across decks and terraces instead of spreading out.

Areas we serve in Manhattan Beach:Sand SectionTree SectionHill SectionEl PortoManhattan VillageLiberty Village

Investment

What this costs in Manhattan Beach

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Retaining walls

$60 to $150 per face foot

What moves it: height, whether the wall is engineered, material choice, drainage behind the wall, and access for equipment and materials

How We Build

Your Manhattan Beach project, step by step

01

Feasibility

We check zoning, setbacks, easements and utilities to confirm what the property will actually support before you spend on drawings.

02

Survey & As-Builts

The site and existing structure are measured and drawn so the permit set starts from reality, not an old plot plan.

03

Design Development

Plans and elevations developed to the level of detail plan check expects, with 3D so you can see it clearly.

04

Consultants

Structural engineering, Title 24 and, where the site needs it, a soils report are coordinated into one set.

05

Submittal

We make the submittal and act as the applicant, so correspondence with the city comes to us rather than to you.

06

Corrections & Issue

We respond to plan-check corrections, resubmit, and see the permit through to issue.

Manhattan Beach Questions

Common questions from Manhattan Beach homeowners

Who issues the permits for this work in Manhattan Beach?

City of Manhattan Beach Community Development Department, Building and Safety Division. Building permits are issued by the Building and Safety Division of the City's Community Development Department, with applications accepted through the Citizen Self Service portal. Manhattan Beach has a certified Local Coastal Program, so the City itself issues Coastal Development Permits under the Coastal Development Permit Procedures chapter of that program, and certain decisions remain appealable to the California Coastal Commission. Coastal Zone projects that add floor area, alter exterior elevations, or add decks and roof decks generally require that permit in addition to the building permit. Plan review here covers architectural, structural, geotechnical, grading and drainage, energy and fire life safety, so timing varies with scope. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.

What makes building in Manhattan Beach different?

Tight and rectangular near the beach — commonly around 30 by 90 feet with three-foot side setbacks — with larger, steeply sloped view parcels up the hill and wider conventional lots inland. In practice that means loose beach sand and dune deposits across much of the west side require engineered shoring, and often caissons, before excavation for a basement, pool or equipment vault..

Which parts of Manhattan Beach do you work in?

All of it, including Sand Section, Tree Section, Hill Section, El Porto. We are based in Los Angeles at Cahuenga Pass, so Manhattan Beach is a short run for our crews rather than a job we service from out of the area.

What does plans, permits & design cost in Manhattan Beach?

Plans, drawings and permit management in this market generally runs $4,500 to $25,000+. What moves it is project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved. We give line-item pricing after seeing the site rather than quoting a number over the phone.

Can you do the plans without doing the build?

Yes. Plans and permits is a service we sell on its own, and plenty of clients use us for the drawing set and permit management and build with someone else. We would rather do it properly than tie it to a construction contract.

Why do permit costs vary so much?

Because the required consultants vary. A straightforward patio cover needs a modest set. An ADU on a sloped lot may need structural engineering, Title 24, a soils report and a survey, and each of those is a separate specialist fee on top of the city's own plan-check and permit charges.

What causes plan-check corrections?

Most commonly incomplete structural detail, missing Title 24 forms, drainage not shown, or a discrepancy between the site plan and the survey. Corrections are normal, not a failure. The thing that costs time is a slow response to them, which is why we act as the applicant.

Do you handle HOA approval too?

Yes, where a community requires it. HOA architectural review runs on its own calendar and its own standards, entirely separately from the city, and starting it late is one of the most common reasons a project slips.

Planning plans, permits & design in Manhattan Beach?

Sit down with your project manager, go through the details, and get an accurate estimate for your property.

Licensed & Insured · LIC #1119054