Skip to main content
Open-plan living room and kitchen with polished concrete floors
Design · Permit · Build

ADUs & Additions in Palos Verdes Estates

Detached ADUs, garage conversions and additions, from plans to move-in.

Built for Palos Verdes Estates Homes

Two separate approvals, and neither substitutes for the other. The City reviews zoning, setbacks, coverage, grading and structural safety; the Palos Verdes Homes Association Art Jury reviews architectural design, and it has done so since 1923.

Any change to a property's exterior appearance, from new construction and remodels to repainting, re-roofing or replacing windows and doors, needs Art Jury approval alongside the City permit. We design to both standards from day one so nothing has to be redrawn later.

Large by coastal standards, with generous frontages, mature landscaping and a high proportion of sloped or canyon-backed sites.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Palos Verdes Estates: The City's Building and Safety Department, working alongside the Planning Department at City Hall on Palos Verdes Drive West, issues residential building permits. Exterior work also requires approval from the Art Jury of the Palos Verdes Homes Association, an architectural review body operating since 1923 that reviews all plans affecting the exterior appearance of structures and properties, including new construction, remodels, repainting, re-roofing and window and door replacement. City approval does not substitute for it.

Permit details checked September 2026 against Palos Verdes Homes Association. Rules change, so we confirm them again for your parcel.

What We Build

  • Art Jury design submittals
  • Geotechnical-led pool and retaining design
  • Haul route and equipment planning
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What to Know in Palos Verdes Estates

These local conditions change the scope, the schedule and the budget.

01

Peninsula bedrock and bentonite-bearing formations underlie much of the area, so geotechnical findings drive pool shell, retaining and foundation design more than architecture does.

02

Narrow curving streets with limited on-street parking make haul routes and equipment sizing an early planning conversation rather than an afterthought.

03

Many parcels slope away from the street toward a canyon or the ocean, turning level outdoor living into terracing and structural decking.

04

Established view relationships between neighbors and mature landscape screening limit how tall a shade structure, pergola or raised spa can reasonably be.

Areas we serve in Palos Verdes Estates:Malaga CoveLunada Bay

Investment

What It Costs in Palos Verdes Estates

Real Southern California price ranges, not teaser numbers.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your lot, access and finishes set the price. We walk the site, then show you where every dollar goes.

Get a line-item price for your Palos Verdes Estates property

The Process

How We Work in Palos Verdes Estates

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Palos Verdes Estates that submittal goes to City of Palos Verdes Estates Building and Safety Department.

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Questions

What Palos Verdes Estates Homeowners Ask

Who issues the permits for this work in Palos Verdes Estates?

City of Palos Verdes Estates Building and Safety Department. The City's Building and Safety Department, working alongside the Planning Department at City Hall on Palos Verdes Drive West, issues residential building permits. Exterior work also requires approval from the Art Jury of the Palos Verdes Homes Association, an architectural review body operating since 1923 that reviews all plans affecting the exterior appearance of structures and properties, including new construction, remodels, repainting, re-roofing and window and door replacement.

City approval does not substitute for it. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Palos Verdes Estates different?

Large by coastal standards, with generous frontages, mature landscaping and a high proportion of sloped or canyon-backed sites. One local condition that shapes the work: Peninsula bedrock and bentonite-bearing formations underlie much of the area, so geotechnical findings drive pool shell, retaining and foundation design more than architecture does.

Which parts of Palos Verdes Estates do you work in?

All of it, including Malaga Cove and Lunada Bay. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Palos Verdes Estates?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU in Palos Verdes Estates?

Sit down with your project manager and get an accurate estimate. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054