ADUs & Additions in Whittier
Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.
ADUs & Additions built for Whittier properties
Whittier's hillside zoning chapter can be amended or repealed only by a vote of the people, and where the city's zoning rules conflict on a hillside property, it tells the Planning Commission and City Council to give preference to protecting the natural environment. The city also has four locally designated historic districts, from Hadley-Greenleaf, where the Craftsman bungalow is the predominant style, to College Hills, subdivided in 1923 on land that was once part of Worsham Ranch, where many properties have panoramic views. In College Hills even the retaining walls, the original street lamps and the Canary Island pines along Bryn Mawr Way and Philadelphia Street are listed as contributing features of the district. A backyard plan here starts with three questions: whether the lot is zoned H-R, whether it sits in a historic district, and where it falls on the state fire hazard map.
Hillside parcels in the H-R zone take their lot area, building site and building heights from each approved hillside development plan. Elsewhere, new R-1 lots generally must be at least 7,000 square feet and new R-E estate lots at least 15,000, buildings including accessory buildings may cover no more than 40 percent of the lot in either zone, and heights top out at 35 feet in R-1 and 30 feet in R-E. Where an R-1 neighborhood is predominantly single story, the city may limit or prohibit second-story additions.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.
Permits in Whittier: Projects are first evaluated by the Planning Services Division, then go through plan review and permit issuance with the Building & Safety Division, both part of the Community Development Department. In the H-R Hillside Residential zone no building permit is issued until a hillside development plan is approved, and later buildings and structures must be found consistent with that approved plan. In the Hadley-Greenleaf, Central Park, College Hills and Earlham historic districts, alterations, additions and new improvements need a Certificate of Appropriateness, or a waiver, before a permit is issued. Additions or accessory structures under 500 square feet and ADUs of 800 square feet or less that are not visible from a public right-of-way can qualify for the waiver when they follow the preservation and design guidelines.
Permit details checked September 2026 against Whittier Municipal Code. Rules change, so we confirm them again for your parcel.
What We Build
- Hillside development plan and grading design
- Certificate of Appropriateness submittals
- Brush clearance and fire-retardant roofing on H-R lots
- Enclosed pool equipment placement
- Retaining wall and pool-fence detailing
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-story additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in Whittier actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Whittier projects.
In the H-R Hillside Residential zone, cuts and fills may not exceed 20 feet in height or a 2:1 slope, ground of 50 percent slope or steeper cannot be graded except to correct earlier grading, landslides or unstable soil, and each building and structure must fit the natural landform as closely as possible.
CAL FIRE's 2025 Local Responsibility Area map shows parts of the northern hills, near Hellman Park, Rideout Way and Turnbull Canyon Road, in a Very High Fire Hazard Severity Zone. The city code treats every H-R lot as high fire risk, requiring fire-retardant roofing and native brush cleared for at least 20 feet around each habitable structure, replanted with fire-resistant cover on automatic sprinklers.
The California Geological Survey's Alquist-Priolo fault trace map shows the Whittier Fault, part of the Elsinore Fault Zone, crossing the eastern part of the city, and any hillside development plan must show the location of known fault lines.
Pool equipment may project into a required yard only inside a fully enclosed structure, and then no more than four feet or 40 percent of the yard's width, whichever is less. Walls and fences in interior side and rear setbacks are generally limited to six feet, the same height allowed for a see-through pool enclosure fence in an interior side yard.
Investment
What this costs in Whittier
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.
Get a line-item price for your Whittier propertyHow We Build
Your Whittier project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Whittier that submittal goes to City of Whittier Community Development Department, Building & Safety Division.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
Whittier Questions
Common questions from Whittier homeowners
Who issues the permits for this work in Whittier?
City of Whittier Community Development Department, Building & Safety Division. Projects are first evaluated by the Planning Services Division, then go through plan review and permit issuance with the Building & Safety Division, both part of the Community Development Department. In the H-R Hillside Residential zone no building permit is issued until a hillside development plan is approved, and later buildings and structures must be found consistent with that approved plan. In the Hadley-Greenleaf, Central Park, College Hills and Earlham historic districts, alterations, additions and new improvements need a Certificate of Appropriateness, or a waiver, before a permit is issued. Additions or accessory structures under 500 square feet and ADUs of 800 square feet or less that are not visible from a public right-of-way can qualify for the waiver when they follow the preservation and design guidelines. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.
What makes building in Whittier different?
Hillside parcels in the H-R zone take their lot area, building site and building heights from each approved hillside development plan. Elsewhere, new R-1 lots generally must be at least 7,000 square feet and new R-E estate lots at least 15,000, buildings including accessory buildings may cover no more than 40 percent of the lot in either zone, and heights top out at 35 feet in R-1 and 30 feet in R-E. Where an R-1 neighborhood is predominantly single story, the city may limit or prohibit second-story additions. One local condition that shapes the work: In the H-R Hillside Residential zone, cuts and fills may not exceed 20 feet in height or a 2:1 slope, ground of 50 percent slope or steeper cannot be graded except to correct earlier grading, landslides or unstable soil, and each building and structure must fit the natural landform as closely as possible.
Which parts of Whittier do you work in?
All of it, including Uptown Whittier, Hadley-Greenleaf, Central Park and College Hills. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.
What does an ADU or addition cost in Whittier?
Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
More services in Whittier
Whittier Guides
Planning guides for Whittier homeowners
Costs, materials and process notes from our own projects.
ADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Math in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guideSecond Story Addition vs Building Out: Which Costs Less
Building out runs $350 to $500 per square foot. Going up runs $450 to $700. Here is when the cheaper option is actually the wrong one, and what drives each number.