Skip to main content
Lawn and built-in outdoor bar with stools beside a modern home at dusk
Design · Permit · Build

Outdoor Kitchen Contractor in Venice

Outdoor kitchens and BBQ islands, designed, permitted and built by one team.

Licensed contractor
California general contractor, CSLB #1119054. Bonded and insured.
Typical cost
Outdoor kitchen and BBQ island: $10,000 to $50,000+.
Permits
Issued by LADBS. We handle the plans and the submittal.

Built for Venice Homes

Groundwater is the first thing we look at. Near the canals and the beach, groundwater can sit shallow enough to reach a pool excavation, which means dewatering, hydrostatic relief and a heavier shell than the drawings first suggest. Narrow walk-street and canal lots rarely take a truck, so material moves by hand or over the roof by crane. On top of all that, almost every parcel needs a coastal permit before a shovel moves.

Unusually narrow lots on walk streets, canals and alley-loaded blocks, with small deep rear yards and minimal street frontage.

What to Plan For

An outdoor kitchen is decided underground first. Where the gas, water, drain and power come from sets where the island can sit and what it costs, so we trace those runs before we draw a counter. A kitchen close to the house is usually simpler to supply than one at the far end of the yard.

Then it is about how you cook. A grill and a prep counter is a different project from a full kitchen with refrigeration, a sink, a pizza oven and bar seating. We lay it out in 3D with the appliances you actually plan to buy, so the cutouts, clearances and counter heights are right before anything is built.

Shade and the patio belong in the same plan. If the kitchen sits under a patio cover, the cover, the venting and the lighting are designed together. Our own crews build the island, run the utilities and finish the surfaces, so one team answers for all of it.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Venice: Building, grading and pool permits are issued by LADBS because this is part of the City of Los Angeles, but nearly the whole community sits inside the coastal zone. The Venice Local Coastal Program is still not fully certified (a Land Use Plan certified in 2001 is in place while an updated plan is being drafted with the California Coastal Commission) so projects need a coastal development permit through Los Angeles City Planning, and city decisions remain appealable to the Commission.

Most projects also require a Venice Coastal Zone Specific Plan (Ordinance No. 175,693) determination or specific plan exemption before a building permit can be issued. In the mapped dual permit jurisdiction area a separate Coastal Commission permit is required as well, so entitlement duration varies widely.

Permit details checked September 2026 against LADBS, LA City Planning and State of California. Rules change, so we confirm them again for your parcel.

What We Build

  • High water table pool engineering and dewatering
  • Coastal development permit and specific plan clearance
  • Crane and conveyor material handling on no-access lots
  • Custom outdoor kitchens and BBQ islands
  • Built-in grills, side burners and griddles
  • Pizza ovens and smokers
  • Outdoor refrigeration, sinks and storage
  • Bar seating and dining counters
  • Porcelain, stone and concrete countertops
  • Stone, stucco and tile island finishes
  • Gas, water, drain and electrical runs
  • Patio covers and pergolas over the kitchen
  • Task, counter and landscape lighting

Local Conditions

What to Know in Venice

These local conditions change the scope, the schedule and the budget.

01

Groundwater near the canals and the beach can be shallow, which can require dewatering during excavation and hydrostatic relief in the finished pool shell.

02

Sandy fill mapped for liquefaction pushes pool and foundation design toward deeper structural solutions than the same project would need a few miles inland.

03

Narrow walk-street and canal lots have no direct vehicle access, so excavated soil, gunite and hardscape material move by conveyor, buggy or crane over the roofline.

04

Salt-laden air and blowing sand shorten the life of untreated metal, so equipment enclosures, fasteners and outdoor kitchen components are specified for that exposure.

Areas we serve in Venice:The Venice CanalsOakwoodMilwoodEast VeniceAbbot Kinney DistrictMarina Peninsula

Investment

What It Costs in Venice

Real Southern California price ranges, not teaser numbers.

Outdoor kitchen and BBQ island

$10,000 to $50,000+

What moves it: counter length, appliance package, countertop material, and whether gas, water and power need to be run a long distance

Pergola and shade structure

from about $9,500

What moves it: span, material (wood, aluminum or louvered), footing requirements, and integrated lighting or heating

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

Your lot, access and finishes set the price. We walk the site, then show you where every dollar goes.

Get a line-item price for your Venice property

The Process

How We Work in Venice

01

Site Review

We measure the yard and trace where gas, water, drain and power can come from, because that decides the layout.

02

Design & 3D

You see the kitchen in 3D with your appliances, counters and seating placed before we build.

03

Plans & Permits

New gas, plumbing and electrical, and any roof structure, are drawn and permitted where the work requires it. In Venice that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Utilities & Base

Trenching, gas and water lines, conduit and the slab or footing the island sits on.

05

Island & Finishes

The island is framed or laid in block, then finished with counters and cladding. Appliances are set and connected.

06

Test & Handover

We test every burner, outlet and fixture, pass final inspection where one applies, and walk you through it.

Questions

What Venice Homeowners Ask

Who issues the permits for this work in Venice?

Los Angeles Department of Building and Safety (LADBS). Building, grading and pool permits are issued by LADBS because this is part of the City of Los Angeles, but nearly the whole community sits inside the coastal zone. The Venice Local Coastal Program is still not fully certified (a Land Use Plan certified in 2001 is in place while an updated plan is being drafted with the California Coastal Commission) so projects need a coastal development permit through Los Angeles City Planning, and city decisions remain appealable to the Commission.

Most projects also require a Venice Coastal Zone Specific Plan (Ordinance No. 175,693) determination or specific plan exemption before a building permit can be issued. In the mapped dual permit jurisdiction area a separate Coastal Commission permit is required as well, so entitlement duration varies widely.

We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Venice different?

Unusually narrow lots on walk streets, canals and alley-loaded blocks, with small deep rear yards and minimal street frontage. One local condition that shapes the work: Groundwater near the canals and the beach can be shallow, which can require dewatering during excavation and hydrostatic relief in the finished pool shell.

Which parts of Venice do you work in?

All of it, including The Venice Canals, Oakwood, Milwood and East Venice. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an outdoor kitchen cost in Venice?

Outdoor kitchen and BBQ island: generally $10,000 to $50,000+ across Southern California. What moves it is counter length, appliance package, countertop material, and whether gas, water and power need to be run a long distance. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an outdoor kitchen take to build?

Most outdoor kitchens take three to six weeks of construction once the design and any permits are settled. Long utility runs, a roof structure over the kitchen and special-order appliances are what stretch that.

Does an outdoor kitchen need a permit?

New gas, plumbing and electrical lines generally do, and so does a roof structure over the kitchen in most cities. A freestanding island with no new utilities often does not. We confirm the permit path with your building department before we price the job.

Can the kitchen go under a patio cover?

Yes, with planning. A grill under a solid roof needs the clearances its manufacturer calls for and usually a vent hood, so we design the cover and the kitchen together rather than adding one to the other later.

What should I decide first?

How you cook and how many people you host. That sets the appliance list and the counter length, which are the two biggest cost drivers along with how far the utilities have to run. Finishes can be chosen later without changing the structure.

Planning an Outdoor Kitchen in Venice?

Sit down with your project manager and get an accurate estimate. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054