
Pool & Spa Remodeling in Venice
New pools, spa additions, replastering, tile and coping, and full pool remodels. Designed, permitted and built by our own crews.
Pool & Spa Remodeling built for Venice properties
Groundwater is the first thing we look at. Near the canals and the beach, a pool excavation can meet water within a few feet of grade, which means dewatering, hydrostatic relief and a heavier shell than the drawings first suggest. Narrow walk-street and canal lots rarely take a truck, so material moves by hand or over the roof by crane. On top of all that, almost every parcel needs a coastal permit before a shovel moves.
Unusually narrow lots, many around thirty feet wide, on walk streets, canals and alley-loaded blocks, with small deep rear yards and minimal street frontage.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.
Permits in Venice: Building, grading and pool permits are issued by LADBS because this is part of the City of Los Angeles, but nearly the whole community sits inside the coastal zone. The Venice Local Coastal Program is still not fully certified — a Land Use Plan certified in 2001 is in place while an updated plan is being drafted with the California Coastal Commission — so projects need a coastal development permit through Los Angeles City Planning, and city decisions remain appealable to the Commission. Most projects also require a Venice Coastal Zone Specific Plan (Ordinance No. 175,693) determination or specific plan exemption before a building permit can be issued. In the mapped dual permit jurisdiction area a separate Coastal Commission permit is required as well, so entitlement duration varies widely.
What We Build
- High water table pool engineering and dewatering
- Coastal development permit and specific plan clearance
- Crane and conveyor material handling on no-access lots
- New gunite pool and spa construction
- Full pool remodels and replastering
- Pebble, quartz and plaster interior finishes
- Waterline tile and coping replacement
- Raised and attached spas with spillways
- Baja shelves, benches and sun ledges
- Water features, fire bowls and sheer descents
- Equipment upgrades, heaters and automation
- Pool decking in pavers, concrete or travertine
- LED lighting and salt-water conversions
Local Conditions
What building in Venice actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Venice projects.
Groundwater near the canals and the beach can be met within a few feet of grade, requiring dewatering during excavation and hydrostatic relief in the finished pool shell.
Sandy fill mapped for liquefaction pushes pool and foundation design toward deeper structural solutions than the same project would need a few miles inland.
Narrow walk-street and canal lots have no direct vehicle access, so excavated soil, gunite and hardscape material move by conveyor, buggy or crane over the roofline.
Salt-laden air and blowing sand shorten the life of untreated metal, so equipment enclosures, fasteners and outdoor kitchen components are specified for that exposure.
Investment
What this costs in Venice
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
New pool construction
$70,000 to $150,000+
What moves it: size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs
Pool remodel and resurfacing
$15,000 to $45,000
What moves it: finish choice (plaster versus pebble or quartz), tile and coping replacement, new equipment, and whether the deck is being replaced at the same time
Paver patio and hardscape
from about $13,000
What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved
How We Build
Your Venice project, step by step
Site Review
We walk the property, check access, soil and slope, and confirm what the yard can actually take.
Design & 3D
You see the pool in 3D before anything is dug, with finishes, tile and decking chosen.
Plans & Permits
We draw the plans, handle engineering where the site needs it, and pull the permits. In Venice that submittal goes to Los Angeles Department of Building and Safety (LADBS).
Excavation & Shell
Dig, steel, plumbing and gunite. This is where site access and grading matter most.
Finishes
Tile, coping, decking and your chosen interior finish go in.
Startup & Handover
We fill, balance the water, commission the equipment and walk you through every control.
Venice Questions
Common questions from Venice homeowners
Who issues the permits for this work in Venice?
Los Angeles Department of Building and Safety (LADBS). Building, grading and pool permits are issued by LADBS because this is part of the City of Los Angeles, but nearly the whole community sits inside the coastal zone. The Venice Local Coastal Program is still not fully certified — a Land Use Plan certified in 2001 is in place while an updated plan is being drafted with the California Coastal Commission — so projects need a coastal development permit through Los Angeles City Planning, and city decisions remain appealable to the Commission. Most projects also require a Venice Coastal Zone Specific Plan (Ordinance No. 175,693) determination or specific plan exemption before a building permit can be issued. In the mapped dual permit jurisdiction area a separate Coastal Commission permit is required as well, so entitlement duration varies widely. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.
What makes building in Venice different?
Unusually narrow lots, many around thirty feet wide, on walk streets, canals and alley-loaded blocks, with small deep rear yards and minimal street frontage. In practice that means groundwater near the canals and the beach can be met within a few feet of grade, requiring dewatering during excavation and hydrostatic relief in the finished pool shell..
Which parts of Venice do you work in?
All of it, including The Venice Canals, Oakwood, Milwood, East Venice. We are based in Los Angeles at Cahuenga Pass, so Venice is a short run for our crews rather than a job we service from out of the area.
What does pool & spa remodeling cost in Venice?
New pool construction in this market generally runs $70,000 to $150,000+. What moves it is size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does a pool remodel take?
A straightforward replaster with new tile and coping usually runs three to five weeks. A full remodel that includes new decking, equipment and features typically runs eight to twelve weeks. Site access and permit timing are the two things that move that most.
How long does a new pool take to build?
Most new pool builds run about three to five months from permit to first swim. Hillside sites that need engineered retaining or difficult access sit at the longer end of that range.
Should I replaster or fully remodel?
If the shell and plumbing are sound and you only dislike the surface, replastering with new tile and coping is the efficient choice. If the equipment is aging, the deck is cracked or the shape no longer suits how you use the yard, a full remodel costs less than doing it in two separate phases.
Do you self-perform the work?
Yes. Our own crews handle the build rather than passing it to a rotating set of subs, which is why the schedule and the finish standard stay consistent.
More services in Venice
Venice Guides
Planning guides for Venice homeowners
Costs, materials and process notes from our own projects.
ADU Design Ideas for Los Angeles Neighborhoods
Los Angeles neighborhoods have distinct characters that should inform ADU design. Explore ideas for ADUs that complement homes in Silver Lake, Venice, the Valley, and beyond.
Read guideBuilding a Pool in Northridge: Costs, Soil and the LADBS Process
A new pool in Northridge typically runs $85,000 to $165,000 all-in with decking and equipment. The tract lots are generous, the soil is workable, and the real variables are access, spa and deck square footage.
Read guideVan Nuys Pool and Backyard Guide: Costs on the Valley Floor
A new pool in Van Nuys runs $75,000 to $145,000, and a pool-plus-backyard package $110,000 to $220,000. Flat lots keep excavation honest; older service panels and gas meters are where budgets slip.
Read guideTravertine vs Porcelain Pavers: The Honest Comparison for SoCal Yards
Travertine installs at roughly $22 to $30 per square foot, porcelain at $24 to $34. The real difference is heat, staining and how each one handles a chlorinated pool deck over ten years.
Read guidePlanning pool & spa remodeling in Venice?
Sit down with your project manager, go through the details, and get an accurate estimate for your property.
Licensed & Insured · LIC #1119054
