Skip to main content
Glass-tile water wall with sheer descents spilling into a pool
Mar Vista, California

Pool & Spa Remodeling in Mar Vista

New pools, spa additions, replastering, tile and coping, and full pool remodels. Designed, permitted and built by our own crews.

Pool & Spa Remodeling built for Mar Vista properties

Mar Vista began in 1904 as Ocean Park Heights, a subdivision of one-acre lots along the rail line that ran where Venice Boulevard is today. The name Mar Vista first appeared in real estate advertising in 1923, and residents voted to join Los Angeles in 1927. Most of the land still open by World War II was built out during and just after the war, largely with modest one-story houses. North of Venice Boulevard, more than four in five single-family lots lie inside the city's Hillside Grading Area, so a new pool there needs a grading permit alongside its building permit. Near Palms Boulevard, Gregory Ain's 1948 Mar Vista Tract of 52 modernist houses, landscaped by Garrett Eckbo, is a Historic Preservation Overlay Zone, though an in-ground rear-yard pool that cannot be seen from the street is exempt from its review.

Mostly single-family lots, with a median of about 6,000 square feet in LA County Assessor parcel data and the middle half falling between roughly 5,400 and 7,000 square feet. The large majority sit north of Venice Boulevard. South of the boulevard, none of the single-family lots are in the Hillside Grading Area, and multifamily buildings make up a far larger share of the residential lots.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Mar Vista: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. More than four in five single-family lots north of Venice Boulevard fall inside the city's Hillside Grading Area, where pool excavation needs its own grading permit, but no part of Mar Vista lies in the Hillside Area where the Baseline Hillside Ordinance applies. In 2017, Ordinance No. 184,814 rezoned most of the neighborhood's single-family lots from R1-1 to R1V2, so new houses and additions follow the R1V2 standards in LAMC Section 12.08. On the 52 parcels of the Gregory Ain Mar Vista Tract HPOZ, significant work on a contributing house needs a Certificate of Appropriateness. A rear-yard addition under 250 square feet that is not visible from the street and stays within the existing roofline and side planes is reviewed by the Director of Planning rather than the HPOZ Board.

Permit details checked September 2026 against LADBS, LA City Planning and LA City Clerk. Rules change, so we confirm them again for your parcel.

What We Build

  • Grading permits for pools north of Venice Boulevard
  • R1V2 zoning checks for additions
  • HPOZ review in the Gregory Ain tract
  • Electrical and sewer checks for post-war houses
  • New gunite pool and spa construction
  • Full pool remodels and replastering
  • Pebble, quartz and plaster interior finishes
  • Waterline tile and coping replacement
  • Raised and attached spas with spillways
  • Baja shelves, benches and sun ledges
  • Water features, fire bowls and sheer descents
  • Equipment upgrades, heaters and automation
  • Pool decking in pavers, concrete or travertine
  • LED lighting and salt-water conversions

Local Conditions

What building in Mar Vista actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Mar Vista projects.

01

Assessor records date roughly seven in ten single-family houses to the 1940s and 1950s, so the capacity of the existing electrical service and the condition of the sewer lateral are worth confirming before pool equipment, an outdoor kitchen or an ADU is added.

02

In the Gregory Ain tract, Garrett Eckbo's open, verdant front yards and parkway trees are part of what the district protects. A front-yard fence or hedge, paving that expands the existing hardscape, removal of a mature tree, or planting that leaves less than 60 percent of the front yard covered all need HPOZ review, while rear-yard landscape and hardscape work on non-corner lots is exempt unless it removes a mature tree or a surveyed feature.

03

The tract's preservation plan keeps swimming pools to an enclosed rear yard, treats above-ground pools and large pool features visible to the public, such as fountains, slides and waterfalls, as generally inappropriate, and rules out earthwork that creates artificial topography on its generally flat lots.

Areas we serve in Mar Vista:Gregory Ain Mar Vista TractWestdaleNorth WestdaleMar Vista Oval District

Investment

What this costs in Mar Vista

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

New pool construction

$70,000 to $150,000+

What moves it: size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs

Pool remodel and resurfacing

$15,000 to $45,000

What moves it: finish choice (plaster versus pebble or quartz), tile and coping replacement, new equipment, and whether the deck is being replaced at the same time

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Mar Vista property

How We Build

Your Mar Vista project, step by step

01

Site Review

We walk the property, check access, soil and slope, and confirm what the yard can actually take.

02

Design & 3D

You see the pool in 3D before anything is dug, with finishes, tile and decking chosen.

03

Plans & Permits

We draw the plans, handle engineering where the site needs it, and pull the permits. In Mar Vista that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Excavation & Shell

Dig, steel, plumbing and gunite. This is where site access and grading matter most.

05

Finishes

Tile, coping, decking and your chosen interior finish go in.

06

Startup & Handover

We fill, balance the water, commission the equipment and walk you through every control.

Mar Vista Questions

Common questions from Mar Vista homeowners

Who issues the permits for this work in Mar Vista?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. More than four in five single-family lots north of Venice Boulevard fall inside the city's Hillside Grading Area, where pool excavation needs its own grading permit, but no part of Mar Vista lies in the Hillside Area where the Baseline Hillside Ordinance applies. In 2017, Ordinance No. 184,814 rezoned most of the neighborhood's single-family lots from R1-1 to R1V2, so new houses and additions follow the R1V2 standards in LAMC Section 12.08. On the 52 parcels of the Gregory Ain Mar Vista Tract HPOZ, significant work on a contributing house needs a Certificate of Appropriateness. A rear-yard addition under 250 square feet that is not visible from the street and stays within the existing roofline and side planes is reviewed by the Director of Planning rather than the HPOZ Board. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Mar Vista different?

Mostly single-family lots, with a median of about 6,000 square feet in LA County Assessor parcel data and the middle half falling between roughly 5,400 and 7,000 square feet. The large majority sit north of Venice Boulevard. South of the boulevard, none of the single-family lots are in the Hillside Grading Area, and multifamily buildings make up a far larger share of the residential lots. One local condition that shapes the work: Assessor records date roughly seven in ten single-family houses to the 1940s and 1950s, so the capacity of the existing electrical service and the condition of the sewer lateral are worth confirming before pool equipment, an outdoor kitchen or an ADU is added.

Which parts of Mar Vista do you work in?

All of it, including Gregory Ain Mar Vista Tract, Westdale, North Westdale and Mar Vista Oval District. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does a pool or spa project cost in Mar Vista?

New pool construction: generally $70,000 to $150,000+ across Southern California. What moves it is size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does a pool remodel take?

A straightforward replaster with new tile and coping usually runs three to five weeks. A full remodel that includes new decking, equipment and features typically runs eight to twelve weeks. Site access and permit timing are the two things that move that most.

How long does a new pool take to build?

Most new pool builds run about three to five months from permit to first swim. Hillside sites that need engineered retaining or difficult access sit at the longer end of that range.

Should I replaster or fully remodel?

If the shell and plumbing are sound and you only dislike the surface, replastering with new tile and coping is the efficient choice. If the equipment is aging, the deck is cracked or the shape no longer suits how you use the yard, a full remodel costs less than doing it in two separate phases.

Do you self-perform the work?

Yes. Our own crews handle the build rather than passing it to a rotating set of subs, which is why the schedule and the finish standard stay consistent.

Planning a pool or spa project in Mar Vista?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054