
Backyard & Outdoor Living in Mar Vista
Full backyard transformations, pavers, outdoor kitchens, fire features, shade structures and turf. Designed, permitted and built by our own crews.
Backyard & Outdoor Living built for Mar Vista properties
Mar Vista began in 1904 as Ocean Park Heights, a subdivision of one-acre lots along the rail line that ran where Venice Boulevard is today. The name Mar Vista first appeared in real estate advertising in 1923, and residents voted to join Los Angeles in 1927. Most of the land still open by World War II was built out during and just after the war, largely with modest one-story houses. North of Venice Boulevard, more than four in five single-family lots lie inside the city's Hillside Grading Area, so a new pool there needs a grading permit alongside its building permit. Near Palms Boulevard, Gregory Ain's 1948 Mar Vista Tract of 52 modernist houses, landscaped by Garrett Eckbo, is a Historic Preservation Overlay Zone, though an in-ground rear-yard pool that cannot be seen from the street is exempt from its review.
Mostly single-family lots, with a median of about 6,000 square feet in LA County Assessor parcel data and the middle half falling between roughly 5,400 and 7,000 square feet. The large majority sit north of Venice Boulevard. South of the boulevard, none of the single-family lots are in the Hillside Grading Area, and multifamily buildings make up a far larger share of the residential lots.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.
Permits in Mar Vista: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. More than four in five single-family lots north of Venice Boulevard fall inside the city's Hillside Grading Area, where pool excavation needs its own grading permit, but no part of Mar Vista lies in the Hillside Area where the Baseline Hillside Ordinance applies. In 2017, Ordinance No. 184,814 rezoned most of the neighborhood's single-family lots from R1-1 to R1V2, so new houses and additions follow the R1V2 standards in LAMC Section 12.08. On the 52 parcels of the Gregory Ain Mar Vista Tract HPOZ, significant work on a contributing house needs a Certificate of Appropriateness. A rear-yard addition under 250 square feet that is not visible from the street and stays within the existing roofline and side planes is reviewed by the Director of Planning rather than the HPOZ Board.
Permit details checked September 2026 against LADBS, LA City Planning and LA City Clerk. Rules change, so we confirm them again for your parcel.
What We Build
- Grading permits for pools north of Venice Boulevard
- R1V2 zoning checks for additions
- HPOZ review in the Gregory Ain tract
- Electrical and sewer checks for post-war houses
- Full backyard transformations
- Paver patios, driveways and walkways
- Outdoor kitchens and BBQ islands
- Pergolas, patio covers and shade structures
- Fire pits, fire tables and fireplaces
- Retaining walls and seat walls
- Artificial turf and drought-tolerant planting
- Drainage correction and grading
- Landscape and architectural lighting
- Front yard and curb appeal remodels
Local Conditions
What building in Mar Vista actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Mar Vista projects.
Assessor records date roughly seven in ten single-family houses to the 1940s and 1950s, so the capacity of the existing electrical service and the condition of the sewer lateral are worth confirming before pool equipment, an outdoor kitchen or an ADU is added.
In the Gregory Ain tract, Garrett Eckbo's open, verdant front yards and parkway trees are part of what the district protects. A front-yard fence or hedge, paving that expands the existing hardscape, removal of a mature tree, or planting that leaves less than 60 percent of the front yard covered all need HPOZ review, while rear-yard landscape and hardscape work on non-corner lots is exempt unless it removes a mature tree or a surveyed feature.
The tract's preservation plan keeps swimming pools to an enclosed rear yard, treats above-ground pools and large pool features visible to the public, such as fountains, slides and waterfalls, as generally inappropriate, and rules out earthwork that creates artificial topography on its generally flat lots.
Investment
What this costs in Mar Vista
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Full backyard transformation
$50,000 to $250,000+
What moves it: how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting
Paver patio and hardscape
from about $13,000
What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved
Outdoor kitchen and BBQ island
$10,000 to $50,000+
What moves it: counter length, appliance package, countertop material, and whether gas, water and power need to be run a long distance
Pergola and shade structure
from about $9,500
What moves it: span, material (wood, aluminum or louvered), footing requirements, and integrated lighting or heating
Artificial turf
from about $9,900
What moves it: area, turf grade, base depth, drainage, and any pet-specific infill
Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.
Get a line-item price for your Mar Vista propertyHow We Build
Your Mar Vista project, step by step
Site Review
We measure the yard, check drainage and grade, and find the constraints before design starts.
Design & 3D
You walk the whole yard in 3D, so layout and materials are settled before we build.
Plans & Permits
Structures, walls and electrical get drawn and permitted where the work requires it. In Mar Vista that submittal goes to Los Angeles Department of Building and Safety (LADBS).
Demo & Grading
Old surfaces come out, levels are set and drainage is corrected properly.
Build
Hardscape, structures, kitchen, features and lighting go in, sequenced by our own crews.
Planting & Handover
Planting, turf and final detail, then a full walkthrough of the finished yard.
Mar Vista Questions
Common questions from Mar Vista homeowners
Who issues the permits for this work in Mar Vista?
Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. More than four in five single-family lots north of Venice Boulevard fall inside the city's Hillside Grading Area, where pool excavation needs its own grading permit, but no part of Mar Vista lies in the Hillside Area where the Baseline Hillside Ordinance applies. In 2017, Ordinance No. 184,814 rezoned most of the neighborhood's single-family lots from R1-1 to R1V2, so new houses and additions follow the R1V2 standards in LAMC Section 12.08. On the 52 parcels of the Gregory Ain Mar Vista Tract HPOZ, significant work on a contributing house needs a Certificate of Appropriateness. A rear-yard addition under 250 square feet that is not visible from the street and stays within the existing roofline and side planes is reviewed by the Director of Planning rather than the HPOZ Board. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.
What makes building in Mar Vista different?
Mostly single-family lots, with a median of about 6,000 square feet in LA County Assessor parcel data and the middle half falling between roughly 5,400 and 7,000 square feet. The large majority sit north of Venice Boulevard. South of the boulevard, none of the single-family lots are in the Hillside Grading Area, and multifamily buildings make up a far larger share of the residential lots. One local condition that shapes the work: Assessor records date roughly seven in ten single-family houses to the 1940s and 1950s, so the capacity of the existing electrical service and the condition of the sewer lateral are worth confirming before pool equipment, an outdoor kitchen or an ADU is added.
Which parts of Mar Vista do you work in?
All of it, including Gregory Ain Mar Vista Tract, Westdale, North Westdale and Mar Vista Oval District. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.
What does a backyard or outdoor living project cost in Mar Vista?
Full backyard transformation: generally $50,000 to $250,000+ across Southern California. What moves it is how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does a backyard remodel take?
A patio and turf refresh often finishes in three to five weeks. A full transformation with hardscape, an outdoor kitchen, structures and lighting typically runs ten to sixteen weeks, and longer if a pool is part of the same phase.
Pavers or poured concrete?
Pavers cost more up front but flex with ground movement instead of cracking, and individual units can be lifted and replaced. Poured concrete is cheaper initially, but a crack means cutting out and repouring a section that rarely matches. On most Southern California soil we recommend pavers for anything you will look at every day.
Can you fix drainage at the same time?
Yes, and on most projects we insist on it. Correcting grade and adding proper drainage while the yard is already open is far cheaper than retrofitting it after new hardscape is down.
Do you handle the whole yard in one project?
Yes. Design, permits, hardscape, structures, kitchen, lighting and planting run through one team and one project manager, so nothing gets lost between trades.
More services in Mar Vista
Mar Vista Guides
Planning guides for Mar Vista homeowners
Costs, materials and process notes from our own projects.
Whole-Home Remodel Sequencing: What to Do First
A whole-home remodel done in the wrong order costs 15 to 25 percent more. Here is the correct sequence, from structural and roof through to paint, and why each stage has to precede the next.
Read guideIndoor-Outdoor Living Conversions in Southern California
A 16-foot multi-slide door runs $18,000 to $45,000 installed. Here is how the full indoor-outdoor conversion works, from structural header to flush threshold to covered patio tie-in.
Read guideTarzana Outdoor Living: A Builder's Guide to South of the Boulevard Lots
Tarzana backyards run hot and deep. A working outdoor living build here (shade, hardscape, kitchen, lighting) typically lands between $85,000 and $220,000, and the ground drives most of the number.
Read guidePorter Ranch Backyard Transformation: Wind, Slope and What It Costs
A full backyard transformation in Porter Ranch runs $95,000 to $280,000. Wind exposure, slope, HOA review and fire-zone material rules shape the design before anything about style enters the conversation.
Read guidePlanning a backyard or outdoor living project in Mar Vista?
Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.
Licensed, bonded & insured · CSLB license #1119054