Skip to main content
Pool with in-water loungers and a spa spillway framed by tropical planting
El Segundo, California

Pool & Spa Remodeling in El Segundo

New pools, spa additions, replastering, tile and coping, and full pool remodels. Designed, permitted and built by our own crews.

Pool & Spa Remodeling built for El Segundo properties

El Segundo is a small beach city with a large industrial footprint. The Chevron refinery covers roughly a third of its land, the east side is given over to industry, offices, research and development and an Air Force base, and the General Plan places every home in the northwest quadrant. That leaves a compact, established residential core, almost entirely built out, where the City's planning documents record a trend toward larger homes through additions and full replacements. LAX, next door, shapes design as well. Inside the City's Residential Sound Insulation zones, new buildings and additions must meet noise standards that reach window ratings, bedroom glazing and even the kitchen hood, choices best settled in the first drawings rather than at plan check.

Mostly single-family streets, with two-family lots scattered throughout and a substantial share of multi-family housing, all within the northwest quadrant of the city. The General Plan sets 5,000 square feet as the minimum for new single-family lots and notes a trend toward larger homes, both through additions and through older houses replaced with larger new ones.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in El Segundo: Building permits come from the Building and Safety Division of the Community Development Department, which takes applications, plans and fee payments through its online E-Z Permit Hub and requires a permit for pool and spa installations and most excavation. The City states that regular plan check takes one to four weeks depending on scope and that accelerated plan check is aimed at seven working days, both counted from payment of plan review fees. Work that builds or alters a sidewalk, alley or public street also needs a permit from the Public Works Department. Inside the Residential Sound Insulation zones near LAX, new buildings and additions must meet the City's noise standards, with the checklist for the 65-70 dB or 70+ dB zone attached to the submitted plans.

What We Build

  • LAX noise-zone window, door and ventilation specs
  • Pool and spa permits through the E-Z Permit Hub
  • Public Works permits for sidewalk and alley work
  • Infill staging on built-out residential streets
  • New gunite pool and spa construction
  • Full pool remodels and replastering
  • Pebble, quartz and plaster interior finishes
  • Waterline tile and coping replacement
  • Raised and attached spas with spillways
  • Baja shelves, benches and sun ledges
  • Water features, fire bowls and sheer descents
  • Equipment upgrades, heaters and automation
  • Pool decking in pavers, concrete or travertine
  • LED lighting and salt-water conversions

Local Conditions

What building in El Segundo actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on El Segundo projects.

01

In the 65-70 dB noise zone, the City's prescriptive checklist calls for openable windows rated at least STC 35, caps glazing in sleeping rooms at 20 percent of the lesser of floor or wall area, and requires kitchen cooktop hoods to be non-ducted recirculating units with no connection to the exterior.

02

The same checklist requires quarter-inch glass in sliding glass doors and at least STC 35 for hinged exterior doors facing the noise source, so a wide glass opening to the yard has to be specified to that standard from the outset.

03

The City reports that its Residential Sound Insulation Program, begun in 1993, has treated 1,905 homes for LAX noise, and the airport's program can retrofit exterior doors, windows and ventilation, so an older house may already carry acoustic upgrades that a remodel needs to account for.

04

The General Plan describes the city as almost entirely built out, so a pool, ADU or addition is infill work, with excavation, spoil haul and concrete deliveries staged around occupied neighboring homes.

Areas we serve in El Segundo:Downtown El SegundoGrand AvenueImperial Avenue

Investment

What this costs in El Segundo

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

New pool construction

$70,000 to $150,000+

What moves it: size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs

Pool remodel and resurfacing

$15,000 to $45,000

What moves it: finish choice (plaster versus pebble or quartz), tile and coping replacement, new equipment, and whether the deck is being replaced at the same time

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your El Segundo property

How We Build

Your El Segundo project, step by step

01

Site Review

We walk the property, check access, soil and slope, and confirm what the yard can actually take.

02

Design & 3D

You see the pool in 3D before anything is dug, with finishes, tile and decking chosen.

03

Plans & Permits

We draw the plans, handle engineering where the site needs it, and pull the permits. In El Segundo that submittal goes to City of El Segundo Community Development Department, Building and Safety Division.

04

Excavation & Shell

Dig, steel, plumbing and gunite. This is where site access and grading matter most.

05

Finishes

Tile, coping, decking and your chosen interior finish go in.

06

Startup & Handover

We fill, balance the water, commission the equipment and walk you through every control.

El Segundo Questions

Common questions from El Segundo homeowners

Who issues the permits for this work in El Segundo?

City of El Segundo Community Development Department, Building and Safety Division. Building permits come from the Building and Safety Division of the Community Development Department, which takes applications, plans and fee payments through its online E-Z Permit Hub and requires a permit for pool and spa installations and most excavation. The City states that regular plan check takes one to four weeks depending on scope and that accelerated plan check is aimed at seven working days, both counted from payment of plan review fees. Work that builds or alters a sidewalk, alley or public street also needs a permit from the Public Works Department. Inside the Residential Sound Insulation zones near LAX, new buildings and additions must meet the City's noise standards, with the checklist for the 65-70 dB or 70+ dB zone attached to the submitted plans. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in El Segundo different?

Mostly single-family streets, with two-family lots scattered throughout and a substantial share of multi-family housing, all within the northwest quadrant of the city. The General Plan sets 5,000 square feet as the minimum for new single-family lots and notes a trend toward larger homes, both through additions and through older houses replaced with larger new ones. One local condition that shapes the work: In the 65-70 dB noise zone, the City's prescriptive checklist calls for openable windows rated at least STC 35, caps glazing in sleeping rooms at 20 percent of the lesser of floor or wall area, and requires kitchen cooktop hoods to be non-ducted recirculating units with no connection to the exterior.

Which parts of El Segundo do you work in?

All of it, including Downtown El Segundo, Grand Avenue and Imperial Avenue. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does a pool or spa project cost in El Segundo?

New pool construction: generally $70,000 to $150,000+ across Southern California. What moves it is size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does a pool remodel take?

A straightforward replaster with new tile and coping usually runs three to five weeks. A full remodel that includes new decking, equipment and features typically runs eight to twelve weeks. Site access and permit timing are the two things that move that most.

How long does a new pool take to build?

Most new pool builds run about three to five months from permit to first swim. Hillside sites that need engineered retaining or difficult access sit at the longer end of that range.

Should I replaster or fully remodel?

If the shell and plumbing are sound and you only dislike the surface, replastering with new tile and coping is the efficient choice. If the equipment is aging, the deck is cracked or the shape no longer suits how you use the yard, a full remodel costs less than doing it in two separate phases.

Do you self-perform the work?

Yes. Our own crews handle the build rather than passing it to a rotating set of subs, which is why the schedule and the finish standard stay consistent.

Planning a pool or spa project in El Segundo?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054