
ADUs & Additions in Hidden Hills
Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.
ADUs & Additions built for Hidden Hills properties
Two approvals govern every project inside the gates: the City's and the Hidden Hills Community Association's. The Architectural Committee reviews exterior work — stables, pools, courts, fences, accessory buildings — and the City will not issue a permit without that sign-off. We build the design package to satisfy both at once, and we plan logistics around gate access, recorded bridle-trail easements and neighbors who live very close to the work.
One-acre minimum building sites, mostly flat to gently rolling, with barns, arenas and long private driveways and enough rear yard to plan a pool, guest structure and equestrian improvements as one project.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.
Permits in Hidden Hills: Permits come from the City of Hidden Hills Building and Safety Department, whose plan check, permit issuance and inspection services are provided under contract by Transtech. The City does not issue a building permit until the Hidden Hills Community Association Architectural Committee has approved the exterior design, and that approval covers dwellings, garages, stables, pools, courts, fences and accessory structures. The community's one-acre minimum building site rule and recorded bridle-trail easements both constrain where structures can physically go. The city falls within a very high fire hazard severity zone under CAL FIRE's 2025 local responsibility area mapping.
What We Build
- HHCA Architectural Committee submittals
- Gate and private-road logistics planning
- Equestrian easement-aware site planning
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-storey additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in Hidden Hills actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Hidden Hills projects.
Recorded bridle trail easements cross most parcels and dictate where a pool, guest house or perimeter fence can actually be placed.
Construction access runs through staffed gates on privately maintained roads, so deliveries, crane picks and haul-off have to be scheduled and staged rather than improvised.
Rolling terrain and expansive clay soils mean pool shells, sport courts and detached structures often need deepened footings and engineered subsurface drainage.
Wildland-adjacent frontage brings defensible-space obligations that influence exterior materials and the planting plan around outdoor living areas.
Investment
What this costs in Hidden Hills
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
How We Build
Your Hidden Hills project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Hidden Hills that submittal goes to City of Hidden Hills Building and Safety Department.
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
Hidden Hills Questions
Common questions from Hidden Hills homeowners
Who issues the permits for this work in Hidden Hills?
City of Hidden Hills Building and Safety Department. Permits come from the City of Hidden Hills Building and Safety Department, whose plan check, permit issuance and inspection services are provided under contract by Transtech. The City does not issue a building permit until the Hidden Hills Community Association Architectural Committee has approved the exterior design, and that approval covers dwellings, garages, stables, pools, courts, fences and accessory structures. The community's one-acre minimum building site rule and recorded bridle-trail easements both constrain where structures can physically go. The city falls within a very high fire hazard severity zone under CAL FIRE's 2025 local responsibility area mapping. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.
What makes building in Hidden Hills different?
One-acre minimum building sites, mostly flat to gently rolling, with barns, arenas and long private driveways and enough rear yard to plan a pool, guest structure and equestrian improvements as one project. In practice that means recorded bridle trail easements cross most parcels and dictate where a pool, guest house or perimeter fence can actually be placed..
Which parts of Hidden Hills do you work in?
All of it, including Ashley Ridge, Long Valley Road, Round Meadow, Jed Smith Road. We are based in Los Angeles at Cahuenga Pass, so Hidden Hills is a short run for our crews rather than a job we service from out of the area.
What does adus & additions cost in Hidden Hills?
Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
More services in Hidden Hills
Hidden Hills Guides
Planning guides for Hidden Hills homeowners
Costs, materials and process notes from our own projects.
Luxury Landscaping Ideas for Calabasas Homes
Calabasas and Hidden Hills properties demand exceptional landscaping. Explore design ideas that match the area's luxury standards and create private estate environments.
Read guideADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Maths in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guidePlanning adus & additions in Hidden Hills?
Sit down with your project manager, go through the details, and get an accurate estimate for your property.
Licensed & Insured · LIC #1119054
