
ADUs & Additions in West Hills
Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.
ADUs & Additions built for West Hills properties
On the west edge of the Valley, the Simi Hills push right up against the neighborhoods, and that proximity drives most of what we plan for here. Properties along Valley Circle and the canyon streets sit in fire hazard territory with real brush clearance obligations, sloping rear yards, and oak canopy that triggers protected-tree review. Farther east the ground flattens into conventional tracts, and the job becomes a straightforward yard build.
Parcels run from flat 7,000-square-foot tract lots on the east side to larger sloping half-acre-plus properties toward the hills, several of which back directly onto open space and natural brush.
We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.
Permits in West Hills: LADBS issues residential building, grading and pool permits here, with plan check and inspection at the Van Nuys Development Services Center under the Canoga Park-Winnetka-Woodland Hills-West Hills Community Plan. Properties along the western edge toward the Simi Hills fall inside Very High Fire Hazard Severity Zone mapping, expanded in Cal Fire's 2025 recommended Local Responsibility Area maps for Los Angeles County, which brings LAFD brush clearance requirements and California Building Code Chapter 7A ignition-resistant construction standards. Sloping parcels can also fall in the city's designated hillside area under the Baseline Hillside Ordinance (No. 184,802), limiting grading quantity, height and retaining wall dimensions. Oak and western sycamore are widespread on the canyon-side lots and are protected at four cumulative inches of trunk diameter, requiring an Urban Forestry permit before removal or encroachment.
What We Build
- Fire-hardened outdoor structures and hardscape
- Slope retaining and drainage engineering
- Protected oak root-zone planning
- Detached ADUs, ground-up
- Garage conversions to living space
- Junior ADUs within the main house
- Room additions and bump-outs
- Second-storey additions
- Full kitchens and bathrooms in the ADU
- Separate utility metering where required
- Private entries, patios and landscaping
- Plans, engineering and city submittals
- Title 24 energy compliance
Local Conditions
What building in West Hills actually involves
Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on West Hills projects.
Rear yards on the canyon side slope toward natural drainage courses, so retaining walls, subdrains and erosion control usually come before any finished surface goes in.
Shallow sandstone and cobble in the western foothills slows excavation and can force a redesign of shell depth or footing layout once a probe is done.
Santa Ana wind exposure and ember drift favor noncombustible decking, enclosed eaves, ember-resistant vents and hardscape in the immediate zone around structures.
Established oak canopy shades much of the older housing stock, limiting solar siting and constraining excavator routing around protected root zones.
Investment
What this costs in West Hills
Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.
Detached ADU
$150,000 to $400,000+
What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build
Garage conversion ADU
$80,000 to $180,000
What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom
Plans, drawings and permit management
$4,500 to $25,000+
What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved
How We Build
Your West Hills project, step by step
Feasibility
We check lot size, setbacks, utilities and access to confirm what your property will actually support.
Design & 3D
Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.
Plans & Permits
We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In West Hills that submittal goes to Los Angeles Department of Building and Safety (LADBS).
Foundation & Framing
Site prep, foundation, framing and dry-in by our own crews.
Systems & Finishes
Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.
Final Inspection
We pass final inspection, walk the unit with you and hand over the keys.
West Hills Questions
Common questions from West Hills homeowners
Who issues the permits for this work in West Hills?
Los Angeles Department of Building and Safety (LADBS). LADBS issues residential building, grading and pool permits here, with plan check and inspection at the Van Nuys Development Services Center under the Canoga Park-Winnetka-Woodland Hills-West Hills Community Plan. Properties along the western edge toward the Simi Hills fall inside Very High Fire Hazard Severity Zone mapping, expanded in Cal Fire's 2025 recommended Local Responsibility Area maps for Los Angeles County, which brings LAFD brush clearance requirements and California Building Code Chapter 7A ignition-resistant construction standards. Sloping parcels can also fall in the city's designated hillside area under the Baseline Hillside Ordinance (No. 184,802), limiting grading quantity, height and retaining wall dimensions. Oak and western sycamore are widespread on the canyon-side lots and are protected at four cumulative inches of trunk diameter, requiring an Urban Forestry permit before removal or encroachment. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.
What makes building in West Hills different?
Parcels run from flat 7,000-square-foot tract lots on the east side to larger sloping half-acre-plus properties toward the hills, several of which back directly onto open space and natural brush. In practice that means rear yards on the canyon side slope toward natural drainage courses, so retaining walls, subdrains and erosion control usually come before any finished surface goes in..
Which parts of West Hills do you work in?
All of it, including Shadow Ranch, Platt Ranch, Orcutt Ranch. We are based in Los Angeles at Cahuenga Pass, so West Hills is a short run for our crews rather than a job we service from out of the area.
What does adus & additions cost in West Hills?
Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.
How long does an ADU take start to finish?
Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.
Is a garage conversion cheaper than a detached ADU?
Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.
Can I rent the ADU out?
California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.
Do you handle the permits?
Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.
More services in West Hills
West Hills Guides
Planning guides for West Hills homeowners
Costs, materials and process notes from our own projects.
ADU Cost Breakdown by Size in Los Angeles
A detached ADU in Los Angeles runs $150,000 to $400,000-plus. Here is the real cost broken down by unit size, with the soft costs, utility work and finish decisions that move the number.
Read guideGarage Conversion to ADU: The Step-by-Step Build
A garage conversion runs $80,000 to $180,000 in Southern California. Here is the real sequence, from slab testing and plan check to the raised floor, the mini-split and final sign-off.
Read guideADU Rental Income Maths in the San Fernando Valley
A one-bedroom ADU in the San Fernando Valley rents for roughly $2,100 to $2,900 a month. Here is the honest arithmetic on payback, carrying costs and what the unit adds to the property.
Read guideSecond Storey Addition vs Building Out: Which Costs Less
Building out runs $350 to $500 per square foot. Going up runs $450 to $700. Here is when the cheaper option is actually the wrong one, and what drives each number.
Read guidePlanning adus & additions in West Hills?
Sit down with your project manager, go through the details, and get an accurate estimate for your property.
Licensed & Insured · LIC #1119054
