ADUs & Additions project in Hollywood Hills, California
Hollywood Hills, California

ADUs & Additions in Hollywood Hills

Detached ADUs, garage conversions, room additions and second storeys, designed, permitted and built. Designed, permitted and built by our own crews.

ADUs & Additions built for Hollywood Hills properties

The Hollywood Hills is the most technically demanding work we do, and it is effectively our home turf: our yard sits at Cahuenga Pass, inside the same hills. These are engineering projects before they are design projects. Caissons, retaining, access and haul routes get resolved first, and the reward is the kind of elevated, view-forward pool that is simply not possible on a flat lot.

Steep, view-first parcels where structure and access drive both the schedule and the budget. This is the most engineering-heavy work we do, and it is on our doorstep.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.

Permits in Hollywood Hills: Private pools in the City of Los Angeles are permitted through a combined Building-Mechanical permit. Plumbing plan check applies to apartment and commercial pools, not single-family homes, and using an LADBS pre-approved standard plan shortens plan check. Nearly all of the Hollywood Hills sits in the Hillside Grading Area under the Baseline Hillside Ordinance, and much of it is in a Very High Fire Hazard Severity Zone. Grading, retaining and haul routes are permitted separately from the pool itself.

What We Build

  • Caisson and engineered retaining systems
  • Restricted-access excavation and crane planning
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-storey additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Hollywood Hills actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Hollywood Hills projects.

01

Steep parcels usually require caissons and engineered retaining before a pool shell can be formed

02

Narrow canyon roads restrict truck size, so excavation and concrete logistics are planned around access

03

View-driven design favours elevated decks, infinity edges and glass-tile finishes

04

Fire-zone clearance rules influence planting, decking material and structure placement

Areas we serve in Hollywood Hills:Hollywood HeightsNichols CanyonLaurel CanyonOutpost EstatesBeachwood CanyonCahuenga Pass

Investment

What this costs in Hollywood Hills

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

How We Build

Your Hollywood Hills project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modelled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Hollywood Hills that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Hollywood Hills Questions

Common questions from Hollywood Hills homeowners

Who issues the permits for this work in Hollywood Hills?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a combined Building-Mechanical permit. Plumbing plan check applies to apartment and commercial pools, not single-family homes, and using an LADBS pre-approved standard plan shortens plan check. Nearly all of the Hollywood Hills sits in the Hillside Grading Area under the Baseline Hillside Ordinance, and much of it is in a Very High Fire Hazard Severity Zone. Grading, retaining and haul routes are permitted separately from the pool itself. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.

What makes building in Hollywood Hills different?

Steep, view-first parcels where structure and access drive both the schedule and the budget. This is the most engineering-heavy work we do, and it is on our doorstep. In practice that means steep parcels usually require caissons and engineered retaining before a pool shell can be formed.

Which parts of Hollywood Hills do you work in?

All of it, including Hollywood Heights, Nichols Canyon, Laurel Canyon, Outpost Estates. We are based in Los Angeles at Cahuenga Pass, so Hollywood Hills is a short run for our crews rather than a job we service from out of the area.

What does adus & additions cost in Hollywood Hills?

Detached ADU in this market generally runs $150,000 to $400,000+. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning adus & additions in Hollywood Hills?

Sit down with your project manager, go through the details, and get an accurate estimate for your property.