Skip to main content
Detached backyard ADU with wood siding and black-framed glass doors at dusk
Design · Permit · Build

ADUs & Additions in Studio City

Detached ADUs, garage conversions and additions, from plans to move-in.

Built for Studio City Homes

Studio City sits about ten minutes from our Cahuenga Pass base, and it is two markets in one. Cross Ventura Boulevard heading north and you are on flat, deep lots where a pool, an outdoor kitchen and a lawn all fit comfortably in a single phase.

Head south into the canyons and the same budget buys a very different project, because retaining and access come first and the pool follows.

A split market: flat valley-floor lots north of Ventura Boulevard (the single-family median is about 7,000 square feet in LA County Assessor data) and hillside parcels to the south, which are often larger but steep. The two build very differently and price very differently.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Studio City: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time.

Most properties south of Ventura Boulevard, in the hills, are inside the Hillside Grading Area. A pool there needs its own LADBS grading permit, and the Baseline Hillside Ordinance caps grading and import/export quantities. Much of that hillside is also a Very High Fire Hazard Severity Zone.

Permit details checked September 2026 against LADBS. Rules change, so we confirm them again for your parcel.

What We Build

  • Retaining walls and slope stabilization
  • Canyon-access excavation and haul-off planning
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What to Know in Studio City

These local conditions change the scope, the schedule and the budget.

01

Hillside lots south of Ventura Boulevard often need engineered retaining and caisson work before any pool shell is poured

02

Narrow canyon streets limit equipment access, which drives staging and haul-off planning

03

Flat valley-floor lots north of Ventura Boulevard are far simpler and usually build faster

Areas we serve in Studio City:Silver TriangleFryman Canyon

Investment

What It Costs in Studio City

Real Southern California price ranges, not teaser numbers.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your lot, access and finishes set the price. We walk the site, then show you where every dollar goes.

Get a line-item price for your Studio City property

The Process

How We Work in Studio City

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Studio City that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Questions

What Studio City Homeowners Ask

Who issues the permits for this work in Studio City?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits.

Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Most properties south of Ventura Boulevard, in the hills, are inside the Hillside Grading Area. A pool there needs its own LADBS grading permit, and the Baseline Hillside Ordinance caps grading and import/export quantities.

Much of that hillside is also a Very High Fire Hazard Severity Zone. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Studio City different?

A split market: flat valley-floor lots north of Ventura Boulevard (the single-family median is about 7,000 square feet in LA County Assessor data) and hillside parcels to the south, which are often larger but steep. The two build very differently and price very differently.

One local condition that shapes the work: Hillside lots south of Ventura Boulevard often need engineered retaining and caisson work before any pool shell is poured.

Which parts of Studio City do you work in?

All of it, including Silver Triangle and Fryman Canyon. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Studio City?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU in Studio City?

Sit down with your project manager and get an accurate estimate. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054