Skip to main content
Detached backyard ADU with wood siding and black-framed glass doors at dusk
Valley Village, California

ADUs & Additions in Valley Village

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for Valley Village properties

Valley Village is a compact, level neighborhood in the San Fernando Valley, bounded by Burbank Boulevard, the Hollywood Freeway, the Ventura Freeway and the Tujunga Wash. About four in five of its single-family houses were built between the 1930s and the 1950s, and they still set the tone of its residential streets. The Valley Village Specific Plan, in force since 1993, was written to preserve that single-family character: it caps one-family buildings at 30 feet and requires a City Planning clearance for additions and exterior changes. The projects that suit it best tend to grow outward into the garden rather than upward, with a pool, a shaded terrace and an outdoor kitchen sized to the lot.

Level single-family lots on residential streets such as Hesby Street, La Maida Street and Bellaire Avenue, with apartments and condominiums concentrated along Burbank Boulevard, Riverside Drive and Magnolia Boulevard. In LA County Assessor parcel data the median single-family lot is roughly 7,600 square feet, and about four in five of those houses were built between the 1930s and the 1950s.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Valley Village: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Valley Village is covered by the Valley Village Specific Plan (Ordinance No. 168,613, effective April 4, 1993), which limits one-family buildings to 30 feet in height. Under the City's applicability matrix for the plan, LADBS checks a new or altered pool or spa for a single dwelling against the plan without a separate City Planning clearance, while new houses, additions, exterior alterations, demolitions and site grading all require one.

Permit details checked September 2026 against LADBS, LA City Planning and City of Los Angeles. Rules change, so we confirm them again for your parcel.

What We Build

  • Specific Plan clearance for additions and exterior changes
  • Second stories held under the 30-foot height cap
  • Pool, terrace and kitchen layouts for mid-size lots
  • Additions matched to 1930s to 1950s houses
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in Valley Village actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Valley Village projects.

01

Valley Village sits entirely outside the City's Hillside Grading Area, so hillside grading rules do not apply and slope or retaining work seldom drives the budget

02

Most single-family lots fall between roughly 6,000 and 9,000 square feet, so a pool, terrace and outdoor kitchen have to be planned together to share one yard

03

A new or altered pool on a single-family lot needs no City Planning clearance under the Specific Plan, while an addition or exterior alteration does, so a pool project involves one fewer sign-off than an addition

Areas we serve in Valley Village:Huston StreetOtsego StreetHartsook StreetAddison Street

Investment

What this costs in Valley Village

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Valley Village property

How We Build

Your Valley Village project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In Valley Village that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

Valley Village Questions

Common questions from Valley Village homeowners

Who issues the permits for this work in Valley Village?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Valley Village is covered by the Valley Village Specific Plan (Ordinance No. 168,613, effective April 4, 1993), which limits one-family buildings to 30 feet in height. Under the City's applicability matrix for the plan, LADBS checks a new or altered pool or spa for a single dwelling against the plan without a separate City Planning clearance, while new houses, additions, exterior alterations, demolitions and site grading all require one. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Valley Village different?

Level single-family lots on residential streets such as Hesby Street, La Maida Street and Bellaire Avenue, with apartments and condominiums concentrated along Burbank Boulevard, Riverside Drive and Magnolia Boulevard. In LA County Assessor parcel data the median single-family lot is roughly 7,600 square feet, and about four in five of those houses were built between the 1930s and the 1950s. One local condition that shapes the work: Valley Village sits entirely outside the City's Hillside Grading Area, so hillside grading rules do not apply and slope or retaining work seldom drives the budget.

Which parts of Valley Village do you work in?

All of it, including Huston Street, Otsego Street, Hartsook Street and Addison Street. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in Valley Village?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in Valley Village?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054