Skip to main content
Open-plan living room and kitchen with polished concrete floors
San Pedro, California

ADUs & Additions in San Pedro

Detached ADUs, garage conversions, room additions and second stories. Designed, permitted and built by our own crews.

ADUs & Additions built for San Pedro properties

San Pedro was annexed by Los Angeles in 1909, and much of it still follows the grid of streets, blocks and alleys laid out in 1882, framed by the harbor to the east, ocean bluffs to the south and hill slopes along the Rancho Palos Verdes border. Coastal and central neighborhoods such as Point Fermin, the Palisades and Vista del Oro were essentially built out by the mid 1960s, while much of the single-family housing in the northwest went up between 1960 and 1980. Along the ocean edge the ground sets the terms: a 2011 landslide destroyed a 600-foot section of Paseo del Mar, and within the coastal zone the San Pedro Specific Plan adds height limits, public view protections and, in mapped hazard areas, geologic reports to the standard City permits.

The oldest neighborhoods sit close to the waterfront on a traditional street grid, mixing single-family and multi-family housing, while Point Fermin, between the Middle and Upper Reservations of Fort MacArthur, carries California Craftsman and bungalow architecture. Most other single-family neighborhoods, concentrated in the south and west, were developed after World War II and are predominantly modern and ranch-style homes on larger lots. The 2017 Community Plan notes that single-family activity has largely taken the form of remodeling and enlarging original tract homes.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in San Pedro: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. The City's Hillside Grading Area covers most of San Pedro, from the northwest hills to the bluff-top blocks near Point Fermin, and a pool excavation inside it needs its own LADBS grading permit. The older grid east of Gaffey Street between about 6th and 22nd Streets, Vinegar Hill included, lies outside that mapped area. Within the coastal zone, the San Pedro Specific Plan (Ordinance No. 166,352) requires LADBS to confirm compliance before issuing a grading or building permit, and it limits residential buildings to two stories or 26 feet, with no extra height allowed for sloping lots. In the plan's mapped Geologically Hazardous Areas, a building permit also waits on an LADBS-approved report from a registered geologist or soils engineer and a recorded disclosure of the hazards that report identifies. In the Vinegar Hill Historic Preservation Overlay Zone, adopted in 2001 and expanded in 2015, rehabilitation and new development are reviewed to protect the district's historic character.

Permit details checked September 2026 against LADBS and LA City Planning. Rules change, so we confirm them again for your parcel.

What We Build

  • Hillside grading permits for pools
  • Geologic reports in mapped hazard areas
  • Specific Plan height and viewsite limits
  • Vinegar Hill HPOZ preservation review
  • Detached ADUs, ground-up
  • Garage conversions to living space
  • Junior ADUs within the main house
  • Room additions and bump-outs
  • Second-story additions
  • Full kitchens and bathrooms in the ADU
  • Separate utility metering where required
  • Private entries, patios and landscaping
  • Plans, engineering and city submittals
  • Title 24 energy compliance

Local Conditions

What building in San Pedro actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on San Pedro projects.

01

The coastal bluffs have a record of movement: a 2011 landslide destroyed a 600-foot section of Paseo del Mar beside the White Point Nature Preserve, and the former 600 block of Paseo del Mar, now known as Sunken City, began sliding into the sea in 1929, so geotechnical findings lead any bluff-side design.

02

Much of San Pedro is hilly, with coastal bluffs and hill slopes along the Rancho Palos Verdes border, and most of it lies inside the Hillside Grading Area, so grading, retaining and drainage belong in the first round of design.

03

The Community Plan flags liquefaction-prone areas along Paseo del Mar, where new discretionary development must prepare a geotechnical report.

04

Near the Lookout Point, Korean Bell and Osgood-Farley Battery public viewsites, the Specific Plan caps new construction and remodeling at 24 feet unless the Director of Planning finds that more height will not block the view.

Areas we serve in San Pedro:Point FerminVinegar HillThe PalisadesVista del OroSouth Shores

Investment

What this costs in San Pedro

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Detached ADU

$150,000 to $400,000+

What moves it: square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build

Garage conversion ADU

$80,000 to $180,000

What moves it: whether the existing slab and framing meet current code, how far utilities have to run, and the finish level of the kitchen and bathroom

Plans, drawings and permit management

$4,500 to $25,000+

What moves it: project type and size, whether structural engineering, Title 24 or a soils report is required, and how many jurisdictions or review bodies are involved

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your San Pedro property

How We Build

Your San Pedro project, step by step

01

Feasibility

We check lot size, setbacks, utilities and access to confirm what your property will actually support.

02

Design & 3D

Layout, elevations and finishes, modeled in 3D so you approve the unit before submittal.

03

Plans & Permits

We prepare the full drawing set, handle engineering and Title 24, and manage the city submittal and corrections. In San Pedro that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Foundation & Framing

Site prep, foundation, framing and dry-in by our own crews.

05

Systems & Finishes

Electrical, plumbing, HVAC, insulation, then kitchen, bath and interior finishes.

06

Final Inspection

We pass final inspection, walk the unit with you and hand over the keys.

San Pedro Questions

Common questions from San Pedro homeowners

Who issues the permits for this work in San Pedro?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. The City's Hillside Grading Area covers most of San Pedro, from the northwest hills to the bluff-top blocks near Point Fermin, and a pool excavation inside it needs its own LADBS grading permit. The older grid east of Gaffey Street between about 6th and 22nd Streets, Vinegar Hill included, lies outside that mapped area. Within the coastal zone, the San Pedro Specific Plan (Ordinance No. 166,352) requires LADBS to confirm compliance before issuing a grading or building permit, and it limits residential buildings to two stories or 26 feet, with no extra height allowed for sloping lots. In the plan's mapped Geologically Hazardous Areas, a building permit also waits on an LADBS-approved report from a registered geologist or soils engineer and a recorded disclosure of the hazards that report identifies. In the Vinegar Hill Historic Preservation Overlay Zone, adopted in 2001 and expanded in 2015, rehabilitation and new development are reviewed to protect the district's historic character. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in San Pedro different?

The oldest neighborhoods sit close to the waterfront on a traditional street grid, mixing single-family and multi-family housing, while Point Fermin, between the Middle and Upper Reservations of Fort MacArthur, carries California Craftsman and bungalow architecture. Most other single-family neighborhoods, concentrated in the south and west, were developed after World War II and are predominantly modern and ranch-style homes on larger lots. The 2017 Community Plan notes that single-family activity has largely taken the form of remodeling and enlarging original tract homes. One local condition that shapes the work: The coastal bluffs have a record of movement: a 2011 landslide destroyed a 600-foot section of Paseo del Mar beside the White Point Nature Preserve, and the former 600 block of Paseo del Mar, now known as Sunken City, began sliding into the sea in 1929, so geotechnical findings lead any bluff-side design.

Which parts of San Pedro do you work in?

All of it, including Point Fermin, Vinegar Hill, The Palisades and Vista del Oro. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does an ADU or addition cost in San Pedro?

Detached ADU: generally $150,000 to $400,000+ across Southern California. What moves it is square footage, finish level, utility runs, and site access; garage conversions typically run well below a ground-up detached build. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does an ADU take start to finish?

Plan a realistic year. Design and engineering typically take one to three months, city plan check and corrections add several more, and construction usually runs four to eight months depending on size and site access.

Is a garage conversion cheaper than a detached ADU?

Usually yes, and often substantially, because the foundation, walls and roof already exist. The trade-offs are that you lose the garage, and older slabs and framing sometimes need upgrading to meet current code.

Can I rent the ADU out?

California ADU law is designed to allow long-term rental, and an ADU is one of the few ways to add rentable square footage to a single-family lot. Short-term rental rules vary by city, so confirm your local ordinance before counting on that income.

Do you handle the permits?

Yes. Plans, engineering, Title 24 and the city submittal are all handled in-house, including responding to plan-check corrections. That is a service we sell on its own, so it is not something we hand off.

Planning an ADU or addition in San Pedro?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054