Pool & Spa Remodeling project in Malibu, California
Malibu, California

Pool & Spa Remodeling in Malibu

New pools, spa additions, replastering, tile and coping, and full pool remodels. Designed, permitted and built by our own crews.

Pool & Spa Remodeling built for Malibu properties

Septic capacity usually sets the ceiling long before design does. The wastewater system determines how many bedrooms an addition can add and where a pool, its equipment and backwash line are allowed to sit. Because every parcel sits in the coastal zone, we sequence geology, biology and drainage work alongside the coastal permit application rather than after it. On blufftop and canyon sites we also budget for long haul distances and wind-exposed material choices.

Everything from tight beachfront strips between the highway and the sand to multi-acre canyon and ridge parcels with steep buildable pads and long private driveways.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed and insured, LIC #1119054.

Permits in Malibu: The city runs its own Building Safety Division and issues its own building and grading permits. The entire city lies within the coastal zone, and because the Local Coastal Program was certified in 2002 the city itself issues coastal development permits under its Land Use Plan and Local Implementation Plan, including review against the ESHA overlay. Onsite wastewater treatment systems are permitted through the Environmental Sustainability Department's environmental health office, and installing a new system requires its own coastal development permit. Processing depends heavily on required geotechnical, biological and wastewater studies, so schedules vary considerably from parcel to parcel.

What We Build

  • Onsite wastewater capacity analysis
  • Coastal development permit submittal support
  • Geotechnical and shoring coordination
  • New gunite pool and spa construction
  • Full pool remodels and replastering
  • Pebble, quartz and plaster interior finishes
  • Waterline tile and coping replacement
  • Raised and attached spas with spillways
  • Baja shelves, benches and sun ledges
  • Water features, fire bowls and sheer descents
  • Equipment upgrades, heaters and automation
  • Pool decking in pavers, concrete or travertine
  • LED lighting and salt-water conversions

Local Conditions

What building in Malibu actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Malibu projects.

01

Nearly every property runs on an onsite wastewater system rather than a sewer, and its rated capacity limits added bedrooms and constrains where a pool, equipment pad and backwash line can sit.

02

Blufftop and canyon parcels carry documented landslide and erosion history, so geotechnical setbacks and shoring design are settled before any pool or deck layout is finalized.

03

Sustained onshore wind and salt spray degrade untreated metal, cabinetry and fabric fast, which changes material selection for outdoor kitchens, pergolas and pool equipment.

04

Long approaches along winding canyon roads and the highway make concrete pours, crane days and soil export significantly more expensive to stage than comparable flatland work.

Areas we serve in Malibu:Point DumeMalibu ColonySerra RetreatBig RockMalibu ParkTrancas Canyon

Investment

What this costs in Malibu

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

New pool construction

$70,000 to $150,000+

What moves it: size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs

Pool remodel and resurfacing

$15,000 to $45,000

What moves it: finish choice (plaster versus pebble or quartz), tile and coping replacement, new equipment, and whether the deck is being replaced at the same time

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

How We Build

Your Malibu project, step by step

01

Site Review

We walk the property, check access, soil and slope, and confirm what the yard can actually take.

02

Design & 3D

You see the pool in 3D before anything is dug, with finishes, tile and decking chosen.

03

Plans & Permits

We draw the plans, handle engineering where the site needs it, and pull the permits. In Malibu that submittal goes to City of Malibu Building Safety Division (Community Development Department).

04

Excavation & Shell

Dig, steel, plumbing and gunite. This is where site access and grading matter most.

05

Finishes

Tile, coping, decking and your chosen interior finish go in.

06

Startup & Handover

We fill, balance the water, commission the equipment and walk you through every control.

Malibu Questions

Common questions from Malibu homeowners

Who issues the permits for this work in Malibu?

City of Malibu Building Safety Division (Community Development Department). The city runs its own Building Safety Division and issues its own building and grading permits. The entire city lies within the coastal zone, and because the Local Coastal Program was certified in 2002 the city itself issues coastal development permits under its Land Use Plan and Local Implementation Plan, including review against the ESHA overlay. Onsite wastewater treatment systems are permitted through the Environmental Sustainability Department's environmental health office, and installing a new system requires its own coastal development permit. Processing depends heavily on required geotechnical, biological and wastewater studies, so schedules vary considerably from parcel to parcel. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing the city.

What makes building in Malibu different?

Everything from tight beachfront strips between the highway and the sand to multi-acre canyon and ridge parcels with steep buildable pads and long private driveways. In practice that means nearly every property runs on an onsite wastewater system rather than a sewer, and its rated capacity limits added bedrooms and constrains where a pool, equipment pad and backwash line can sit..

Which parts of Malibu do you work in?

All of it, including Point Dume, Malibu Colony, Serra Retreat, Big Rock. We are based in Los Angeles at Cahuenga Pass, so Malibu is a short run for our crews rather than a job we service from out of the area.

What does pool & spa remodeling cost in Malibu?

New pool construction in this market generally runs $70,000 to $150,000+. What moves it is size and shape, spa, water and fire features, decking material, automation, and how much access and grading the site needs. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does a pool remodel take?

A straightforward replaster with new tile and coping usually runs three to five weeks. A full remodel that includes new decking, equipment and features typically runs eight to twelve weeks. Site access and permit timing are the two things that move that most.

How long does a new pool take to build?

Most new pool builds run about three to five months from permit to first swim. Hillside sites that need engineered retaining or difficult access sit at the longer end of that range.

Should I replaster or fully remodel?

If the shell and plumbing are sound and you only dislike the surface, replastering with new tile and coping is the efficient choice. If the equipment is aging, the deck is cracked or the shape no longer suits how you use the yard, a full remodel costs less than doing it in two separate phases.

Do you self-perform the work?

Yes. Our own crews handle the build rather than passing it to a rotating set of subs, which is why the schedule and the finish standard stay consistent.

Planning pool & spa remodeling in Malibu?

Sit down with your project manager, go through the details, and get an accurate estimate for your property.

Licensed & Insured · LIC #1119054