Skip to main content
Resort-Style Remodeling in Malibu
Malibu, California

Resort-Style Remodeling in Malibu

Every lot is in the coastal zone, so geology and drainage studies start with the permit.

Book a ConsultationCall 818-300-2393

We call you back within one business day.

Building Here

Planned Around Septic, Salt and Slope

Septic capacity usually sets the ceiling long before design does. The wastewater system determines how many bedrooms an addition can add and where a pool, its equipment and backwash line are allowed to sit. Because every parcel sits in the coastal zone, we sequence geology, biology and drainage work alongside the coastal permit application rather than after it.

On blufftop and canyon sites we also budget for long haul distances and wind-exposed material choices.

Everything from tight beachfront strips between the highway and the sand to multi-acre canyon and ridge parcels with steep buildable pads and long private driveways.

The team that plans your Malibu project is the team that builds it.

Part of our service area in Los Angeles County.

Local Conditions

The Ground Rules in Malibu

Permits in Malibu

City of Malibu Building Safety Division (Community Development Department)

The city runs its own Building Safety Division and issues its own building and grading permits. The entire city lies within the coastal zone, and because the Local Coastal Program was certified in 2002 the city itself issues coastal development permits under its Land Use Plan and Local Implementation Plan, including review against the ESHA overlay.

Onsite wastewater treatment systems are permitted through the Community Development Department's Wastewater Management and Environmental Health staff, and installing a new system requires its own coastal development permit. Processing depends heavily on required geotechnical, biological and wastewater studies, so schedules vary considerably from parcel to parcel.

Permit details checked September 2026 against City of Malibu. Rules change, so we confirm them again for your parcel.

What We Plan For

  • Onsite wastewater capacity analysis
  • Coastal development permit submittal support
  • Geotechnical and shoring coordination
  1. Nearly every property runs on an onsite wastewater system rather than a sewer, and its rated capacity limits added bedrooms and constrains where a pool, equipment pad and backwash line can sit.

  2. Blufftop and canyon parcels carry documented landslide and erosion history, so geotechnical setbacks and shoring design are settled before any pool or deck layout is finalized.

  3. Sustained onshore wind and salt spray degrade untreated metal, cabinetry and fabric fast, which changes material selection for outdoor kitchens, pergolas and pool equipment.

  4. Long approaches along winding canyon roads and the highway make concrete pours, crane days and soil export significantly more expensive to stage than comparable flatland work.

Neighborhoods We Serve

  • Point Dume
  • Malibu Colony
  • Serra Retreat
  • Big Rock
  • Malibu Park
  • Trancas Canyon

Start Your Project

Plan Your Malibu Project

Tell us about your home and what you want from it. We call you back within one business day.

Licensed, bonded and insured · CSLB #1119054 · Veteran-owned and family-operated