- What to Expect During Excavation
What to Expect During Excavation
Understanding the most disruptive phase of outdoor construction
Remodel Your Vibe Design Team February 15, 20266 min read
Image: Excavator working on pool dig in California backyard
In this article
- The Excavation Process
- Site Access Requirements
- What Gets Disrupted
- Utility Considerations
Excavation transforms your yard into a construction zone. Understanding this phase helps you prepare mentally and practically for what's coming.
In this article
- The Excavation Process
- Site Access Requirements
- What Gets Disrupted
- Utility Considerations
The Excavation Process
Equipment arrives (skid steer, excavator, or manual labor depending on access). Soil is removed to design specifications. Spoils are either hauled away or used on-site for grading.
Site Access Requirements
We need equipment access to your backyard. Side yard access of 36+ inches works for small equipment. Crane lifts or hand excavation may be needed for limited access sites.
Ready to Start Your Project?
Schedule a free consultation with our design team.
Book a Consultation Call 818-300-2393
What Gets Disrupted
Excavation is noisy (wear ear protection). Dust is significant. Lawn, sprinklers, and some landscaping in the work zone will be removed. Plan for 1-5 days of intensive activity.
Utility Considerations
We call USA Underground (811) before digging. Existing irrigation, gas, electric, and plumbing lines may need relocation. We identify these during design.
Final Thoughts
Excavation is temporary but transformative. The mess is followed by visible progress as your new outdoor space takes shape.
Where we build
Build this at your home
We build from Santa Clarita to Long Beach, Thousand Oaks to Riverside, and Orange County down to Mission Viejo. Start with your city:
Frequently Asked Questions
How deep will you dig?
Depends on the project. Pool shallow ends: 3-4 feet. Deep ends: 6-8 feet. Patio base: 8-12 inches. Retaining wall foundations: varies by height.
What happens to the dirt?
Excavated soil is either hauled off-site (additional cost) or used for backfill and grading elsewhere on your property.
Topics
- excavation
- construction
- process
- pool construction
About the author
Remodel Your Vibe Design Team
Written by the design team at Remodel Your Vibe, a licensed ( CSLB #1119054 ), bonded and insured, veteran-owned and family-operated design-build company based in Los Angeles. Our own crews design, permit and build pools, backyards, ADUs and interiors across Greater Los Angeles and Orange County.
Who builds it
- Veteran-owned and family-operated
- Years of experience building across Southern California
- Our own crews build it. One team designs, permits and builds.
Related services
Talk it through with us
Discuss your project with our design team and get expert advice. We call you back within one business day.
Book a Consultation 818-300-2393
Ready to Transform Your Space?
Let's discuss your vision. Schedule a free consultation with our design team and see how we can bring your project to life.
Book a Consultation 818-300-2393
We call you back within one business day.
Continue Reading
Further Reading
Process Guide
Educational
Material Guide
All Construction Process guides
End of text part 1 of 1. This page is complete.