Every Cubic Yard Counts

The grading budget is a genuine design constraint here. The hillside district covering this community plan area caps total cut and fill per site, so a pool, a motor court and a level lawn all compete for the same cubic yards. Roads are narrow and winding, which limits truck size and dictates sequencing for concrete, steel and crane days.

Slope work usually starts with caissons and shoring long before anything looks like a backyard.

Large hillside and canyon parcels with steep slopes, limited flat buildable pad, long private driveways and substantial existing retaining infrastructure.

The team that plans your Bel Air project is the team that builds it.

Part of our service area in Los Angeles County.

Local Conditions

The Ground Rules in Bel Air

Permits in Bel Air

Los Angeles Department of Building and Safety (LADBS)

LADBS issues the building, grading and pool permits, as this is City of Los Angeles territory rather than a separate municipality. The Bel Air-Beverly Crest community plan area was added to the Hillside Construction Regulation supplemental use district effective March 22, 2017 (Ordinance No. 184,828), which caps grading at 6,000 cubic yards per site, adds hauling and construction activity standards, and limits exterior construction to weekdays between 8:00 a.m. and 6:00 p.m., with interior work also allowed on Saturdays during those hours.

Hauling is restricted to weekdays between 9:00 a.m. and 3:00 p.m. The Baseline Hillside Ordinance (No. 184,802) separately governs height, floor area and slope-based limits, and import or export of more than 1,000 cubic yards in a hillside grading area requires a haul route hearing before the Board of Building and Safety Commissioners.

Parcels along the Mulholland corridor also fall under the Mulholland Scenic Parkway Specific Plan, and private homeowner associations in gated tracts can add their own architectural review on top of city review.

Permit details checked September 2026 against LADBS and LA City Planning. Rules change, so we confirm them again for your parcel.

What We Plan For

  • Grading quantity and haul route strategy
  • Caisson, pile and shoring pool structures
  • HOA architectural review submittals
  1. A per-site grading cap means cut and fill for a pool, a motor court and a level lawn all draw from the same limited quantity, so earthwork is designed before aesthetics are settled.

  2. Slope construction typically begins with caissons, tiebacks and shoring, and pool shells on descending lots often sit on structural piles rather than native grade.

  3. Narrow, winding roads with tight radii limit truck and crane size, so concrete pours and steel deliveries are sequenced around access rather than convenience.

  4. Excavation frequently reaches shale and bedrock at shallow depth, which slows digging and increases export volume against a fixed grading allowance.

Neighborhoods We Serve

  • East Gate Bel Air
  • West Gate Bel Air
  • Upper Bel Air
  • Stone Canyon
  • Casiano

Start Your Project

Plan Your Bel Air Project

Tell us about your home and what you want from it. We call you back within one business day.

Licensed, bonded and insured · CSLB #1119054 · Veteran-owned and family-operated