Skip to main content
Luxury Remodeling in Long Beach
Long Beach, California

Luxury Remodeling in Long Beach

Much of the city sits in a mapped methane zone, where new ADUs need mitigation design.

Book a ConsultationCall 818-300-2393

We call you back within one business day.

Building Here

Coastal, Methane and Historic Rules

Few places we work stack this many overlays onto one backyard. Along the shoreline you are in the Coastal Zone. Across large parts of the city you sit inside the mapped Methane Gas Zone, which brings methane mitigation design, and sometimes soil gas testing, into a new construction or addition permit. The designated historic districts add a design review layer on top.

Mostly urban grid lots, often 40 to 50 feet wide with an alley at the rear, with larger parcels in Park Estates and Bixby Knolls and narrow waterfront lots along the canals.

The team that plans your Long Beach project is the team that builds it.

Part of our service area in Los Angeles County.

Local Conditions

The Ground Rules in Long Beach

Permits in Long Beach

City of Long Beach Community Development Department, Building and Safety Bureau

The Building and Safety Bureau within Long Beach Community Development issues residential permits from the Permit Center on West Ocean Boulevard. The City's Local Coastal Program was certified in 1980, so the City issues local Coastal Development Permits for property in the Coastal Zone, which runs along the shoreline from the Los Angeles River to the San Gabriel River, before a building permit, with some decisions appealable to the Coastal Commission.

Some areas remain under the Commission's original permit jurisdiction, so we confirm each parcel on the City's Coastal Zone map. The City maps a Methane Gas Zone over oil-bearing formations and near oil and gas wells; new buildings and additions there need methane mitigation reviewed by the Building and Safety Bureau, and depending on project size a soil gas investigation by a qualified professional may also be required.

Exterior changes in any designated historic district require a Certificate of Appropriateness.

Permit details checked September 2026 against City of Long Beach. Rules change, so we confirm them again for your parcel.

What We Plan For

  • Methane mitigation and soil gas testing coordination
  • Local Coastal Development Permit processing
  • Certificate of Appropriateness submittals
  1. Methane zone parcels need a methane mitigation design for new structures and additions, and larger projects may also need site soil gas testing to set the mitigation level.

  2. Shallow groundwater on the peninsula, the canals and the shoreline blocks complicates pool excavation and can require dewatering and hydrostatic relief detailing.

  3. Liquefaction-susceptible ground near the shoreline and along the river corridor pushes foundations toward engineered solutions rather than standard footings.

  4. Older neighborhoods have alley-served rear yards with original sewer laterals and undersized panels that usually need replacement as part of an ADU or outdoor kitchen scope.

Neighborhoods We Serve

  • Naples
  • Belmont Shore
  • Belmont Heights
  • Bixby Knolls
  • Park Estates
  • California Heights

Start Your Project

Plan Your Long Beach Project

Tell us about your home and what you want from it. We call you back within one business day.

Licensed, bonded and insured · CSLB #1119054 · Veteran-owned and family-operated