Skip to main content
Covered patio with a linear fire table and lounge seating
Downey, California

Backyard & Outdoor Living in Downey

Full backyard transformations, pavers, outdoor kitchens, fire features, shade structures and turf. Designed, permitted and built by our own crews.

Backyard & Outdoor Living built for Downey properties

Downey grew out of Rancho Santa Gertrudes, the land between the Rio Hondo and the San Gabriel River that former governor John Gately Downey began dividing into small farms in 1865. Citrus farming carried the area for almost ninety years before the Second World War brought aviation, and the plant that closed here in 1999 had been the birthplace of the systems for the Apollo program. When Downey incorporated in December 1956, the city's own history records, it already held some of the finest new homes in southeastern Los Angeles County. The ground beneath those homes is predominantly flat, so the questions that shape a backyard here are rarely about slope: they are about where pool equipment may legally sit, how a pool house carries the architecture of the main house, and how much floor area the zoning leaves to add.

Predominantly flat single-family lots zoned R-1, in sub-zones whose minimum lot sizes run from 5,000 to 10,000 square feet with minimum widths of 50 to 70 feet. The floor area ratio tops out at 0.45, or 0.50 with the city's renewable energy bonus, and lot coverage at 45 percent, so the size of an addition is weighed against those limits from the start. A pool house or other accessory building may rise no higher than 12 feet and, garages and patio covers aside, is limited to 700 square feet in one open room without a kitchen or bedroom, designed to match the style, form, color and materials of the house.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Downey: Residential permits, pools included, are issued by the Building and Safety Division of the Community Development Department, on the first floor of Downey City Hall. The division routes plans to each involved city department for concurrent review, and inspections are scheduled through the Accela Citizen Access portal. The zoning code keeps pool equipment, like other mechanical equipment, out of street setbacks and at least four feet from interior property lines, and requires it to be screened from neighboring properties and public streets and placed so noise and vibration do not carry to abutting lots. Detached ADUs beside a single-family home are generally limited to 16 feet in height with four-foot side and rear setbacks, under standards the city adopted in April 2025 and amended in June 2026.

Permit details checked September 2026 against Downey Municipal Code. Rules change, so we confirm them again for your parcel.

What We Build

  • Pool equipment setbacks and screening
  • Pool houses matched to the main house
  • ADU design and setback compliance
  • Geotechnical planning for liquefaction zones
  • Work kept to 7 a.m. to 7 p.m., Monday through Saturday
  • Full backyard transformations
  • Paver patios, driveways and walkways
  • Outdoor kitchens and BBQ islands
  • Pergolas, patio covers and shade structures
  • Fire pits, fire tables and fireplaces
  • Retaining walls and seat walls
  • Artificial turf and drought-tolerant planting
  • Drainage correction and grading
  • Landscape and architectural lighting
  • Front yard and curb appeal remodels

Local Conditions

What building in Downey actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Downey projects.

01

Since the Army Corps of Engineers finished raising the channel levees in 2000, FEMA has placed no Downey property in a 100-year flood zone, and current flood maps show most of the city as Zone X, an area with reduced flood risk due to levee.

02

State seismic hazard maps place the entire city in a liquefaction zone, a condition tied to the area's silty, sandy soils and relatively high water table, and the city requires geotechnical reports for construction projects to identify and mitigate that risk.

03

The city is predominantly flat, with no identified landslide areas, and a permit is required for grading that exceeds 50 cubic yards or affects the drainage of the site, a threshold that matters when pool excavation spoils are spread on site rather than hauled away.

04

Downey sits in California Energy Code climate zone 8, with zone 9 north of Vista Del Rio, and energy calculations are typically required once a project adds or modifies lighting, mechanical systems or the building envelope.

05

CAL FIRE's fire hazard severity zone map of March 2025 classifies Downey as non-wildland, with no hazard zone assigned anywhere in the city.

Areas we serve in Downey:Downtown DowneyGallatin

Investment

What this costs in Downey

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Full backyard transformation

$50,000 to $250,000+

What moves it: how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

Outdoor kitchen and BBQ island

$10,000 to $50,000+

What moves it: counter length, appliance package, countertop material, and whether gas, water and power need to be run a long distance

Pergola and shade structure

from about $9,500

What moves it: span, material (wood, aluminum or louvered), footing requirements, and integrated lighting or heating

Artificial turf

from about $9,900

What moves it: area, turf grade, base depth, drainage, and any pet-specific infill

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Downey property

How We Build

Your Downey project, step by step

01

Site Review

We measure the yard, check drainage and grade, and find the constraints before design starts.

02

Design & 3D

You walk the whole yard in 3D, so layout and materials are settled before we build.

03

Plans & Permits

Structures, walls and electrical get drawn and permitted where the work requires it. In Downey that submittal goes to City of Downey Community Development Department, Building and Safety Division.

04

Demo & Grading

Old surfaces come out, levels are set and drainage is corrected properly.

05

Build

Hardscape, structures, kitchen, features and lighting go in, sequenced by our own crews.

06

Planting & Handover

Planting, turf and final detail, then a full walkthrough of the finished yard.

Downey Questions

Common questions from Downey homeowners

Who issues the permits for this work in Downey?

City of Downey Community Development Department, Building and Safety Division. Residential permits, pools included, are issued by the Building and Safety Division of the Community Development Department, on the first floor of Downey City Hall. The division routes plans to each involved city department for concurrent review, and inspections are scheduled through the Accela Citizen Access portal. The zoning code keeps pool equipment, like other mechanical equipment, out of street setbacks and at least four feet from interior property lines, and requires it to be screened from neighboring properties and public streets and placed so noise and vibration do not carry to abutting lots. Detached ADUs beside a single-family home are generally limited to 16 feet in height with four-foot side and rear setbacks, under standards the city adopted in April 2025 and amended in June 2026. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Downey different?

Predominantly flat single-family lots zoned R-1, in sub-zones whose minimum lot sizes run from 5,000 to 10,000 square feet with minimum widths of 50 to 70 feet. The floor area ratio tops out at 0.45, or 0.50 with the city's renewable energy bonus, and lot coverage at 45 percent, so the size of an addition is weighed against those limits from the start. A pool house or other accessory building may rise no higher than 12 feet and, garages and patio covers aside, is limited to 700 square feet in one open room without a kitchen or bedroom, designed to match the style, form, color and materials of the house. One local condition that shapes the work: Since the Army Corps of Engineers finished raising the channel levees in 2000, FEMA has placed no Downey property in a 100-year flood zone, and current flood maps show most of the city as Zone X, an area with reduced flood risk due to levee.

Which parts of Downey do you work in?

All of it, including Downtown Downey and Gallatin. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does a backyard or outdoor living project cost in Downey?

Full backyard transformation: generally $50,000 to $250,000+ across Southern California. What moves it is how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does a backyard remodel take?

A patio and turf refresh often finishes in three to five weeks. A full transformation with hardscape, an outdoor kitchen, structures and lighting typically runs ten to sixteen weeks, and longer if a pool is part of the same phase.

Pavers or poured concrete?

Pavers cost more up front but flex with ground movement instead of cracking, and individual units can be lifted and replaced. Poured concrete is cheaper initially, but a crack means cutting out and repouring a section that rarely matches. On most Southern California soil we recommend pavers for anything you will look at every day.

Can you fix drainage at the same time?

Yes, and on most projects we insist on it. Correcting grade and adding proper drainage while the yard is already open is far cheaper than retrofitting it after new hardscape is down.

Do you handle the whole yard in one project?

Yes. Design, permits, hardscape, structures, kitchen, lighting and planting run through one team and one project manager, so nothing gets lost between trades.

Planning a backyard or outdoor living project in Downey?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054