Skip to main content
Aerial view of a backyard with a pergola, outdoor kitchen, artificial turf and large pavers
Playa del Rey, California

Backyard & Outdoor Living in Playa del Rey

Full backyard transformations, pavers, outdoor kitchens, fire features, shade structures and turf. Designed, permitted and built by our own crews.

Backyard & Outdoor Living built for Playa del Rey properties

Playa del Rey climbs from the mouth of Ballona Creek onto ancient sand dunes, and where a lot sits on that rise decides most of what a project involves. On the bluffs of the original Palisades del Rey tract, the Coastal Bluffs Specific Plan governs pools on sloping ground, drainage to the street and building height near the curb. On Subarea 3 lots, no new construction within 38 feet of the front lot line may exceed nine feet in height, a limit the City describes as a way to preserve views and have new homes step down the slope instead of massing along the street. Down by the lagoon and the beach, the dunes give way to younger lowland ground mapped for liquefaction, and parcels there can sit in the dual permit area, where the Coastal Commission issues a second permit.

Recent City and Coastal Commission cases here involve lots of roughly 3,500 to 7,300 square feet, and on the Palisades del Rey bluffs many fall steeply away from the street. Below them sit the small village commercial strip along Culver Boulevard and The Jungle, a tight cluster of closely built apartments near the beach.

We are a design-build team, which means the people who draw your project are the people who build it. Design, engineering, permits and construction run through one project manager and our own crews, so nothing gets lost in a handoff between a salesperson and a subcontractor. We are licensed, bonded and insured, CSLB license #1119054.

Permits in Playa del Rey: Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Lots inside the Coastal Bluffs Specific Plan (Ordinance No. 170,046), which covers the Playa del Rey bluffs, carry extra rules. No permit is issued for a pool or spa over ground sloping 7:1 (14.3 percent) or steeper unless it uses a permanent non-chlorine water purification system, and such a pool must be pumped to the street when drained. In Subareas 1 and 3, drainage from roofs, pools and spas must reach an improved street by gravity unless LADBS finds that infeasible and approves another method, and a project that imports or exports more than 10 cubic yards of earth needs a soils and geology report that also addresses earthquake hazards, including the Charnock and Newport-Inglewood faults. Bluff parcels on streets such as Montreal Street and Sunridge Street also sit inside the City's mapped Hillside Grading Area, where a pool excavation needs its own grading permit. The bluff, lagoon and beach areas are in the coastal zone, and because the City has no certified Local Coastal Program for Westchester-Playa del Rey, any required coastal development permit must be found consistent with Chapter 3 of the Coastal Act. Parcels in the dual permit jurisdiction area also need a second coastal development permit from the California Coastal Commission.

Permit details checked September 2026 against LADBS, LA City Planning, LA City Clerk and State of California. Rules change, so we confirm them again for your parcel.

What We Build

  • Coastal Bluffs Specific Plan pool and slope review
  • Gravity drainage to the street for roofs and pools
  • Soils and geology reports for bluff grading
  • Coastal development and dual permit coordination
  • Street-level height limits on Subarea 3 lots
  • Full backyard transformations
  • Paver patios, driveways and walkways
  • Outdoor kitchens and BBQ islands
  • Pergolas, patio covers and shade structures
  • Fire pits, fire tables and fireplaces
  • Retaining walls and seat walls
  • Artificial turf and drought-tolerant planting
  • Drainage correction and grading
  • Landscape and architectural lighting
  • Front yard and curb appeal remodels

Local Conditions

What building in Playa del Rey actually involves

Every city in Southern California builds differently. These are the things that change the scope, the schedule or the budget on Playa del Rey projects.

01

The bluffs are ancient wind-blown dunes, and the state seismic hazard map places their steepest faces in a zone of required investigation for earthquake-induced landslides.

02

The lowlands along Ballona Creek, around Del Rey Lagoon and across the beach fall in the state liquefaction zone, a map meant to prompt site-specific geotechnical investigation before foundations and pool shells are designed.

03

LADBS grading review of one vacant Montreal Street lot recorded a slope dropping about 60 feet from the street, with dune sand over the San Pedro Formation, and accepted consultant reports proposing conventional or drilled-pile foundations.

04

Some bluff parcels, including lots on Montreal Street, are also mapped in a City Methane Zone and a Special Grading Area, and in a Methane Zone a new building needs an engineer-designed methane mitigation system that meets LADBS standards.

Areas we serve in Playa del Rey:Palisades del ReyDel Rey HillsThe JungleDel Rey Lagoon

Investment

What this costs in Playa del Rey

Real Southern California ranges, not a teaser number. Every project is priced line by line after we have seen the site.

Full backyard transformation

$50,000 to $250,000+

What moves it: how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting

Paver patio and hardscape

from about $13,000

What moves it: square footage, paver type, base preparation, drainage, and any steps or retaining involved

Outdoor kitchen and BBQ island

$10,000 to $50,000+

What moves it: counter length, appliance package, countertop material, and whether gas, water and power need to be run a long distance

Pergola and shade structure

from about $9,500

What moves it: span, material (wood, aluminum or louvered), footing requirements, and integrated lighting or heating

Artificial turf

from about $9,900

What moves it: area, turf grade, base depth, drainage, and any pet-specific infill

Your number depends on your lot, your access and your finishes. We walk the site, then price every line so you can see exactly where the budget goes.

Get a line-item price for your Playa del Rey property

How We Build

Your Playa del Rey project, step by step

01

Site Review

We measure the yard, check drainage and grade, and find the constraints before design starts.

02

Design & 3D

You walk the whole yard in 3D, so layout and materials are settled before we build.

03

Plans & Permits

Structures, walls and electrical get drawn and permitted where the work requires it. In Playa del Rey that submittal goes to Los Angeles Department of Building and Safety (LADBS).

04

Demo & Grading

Old surfaces come out, levels are set and drainage is corrected properly.

05

Build

Hardscape, structures, kitchen, features and lighting go in, sequenced by our own crews.

06

Planting & Handover

Planting, turf and final detail, then a full walkthrough of the finished yard.

Playa del Rey Questions

Common questions from Playa del Rey homeowners

Who issues the permits for this work in Playa del Rey?

Los Angeles Department of Building and Safety (LADBS). Private pools in the City of Los Angeles are permitted through a Combined Building-Mechanical permit, while pools serving more than two dwelling units need separate building, electrical, plumbing and mechanical permits. Using a City of Los Angeles standard plan on file with LADBS reduces plan check time. Lots inside the Coastal Bluffs Specific Plan (Ordinance No. 170,046), which covers the Playa del Rey bluffs, carry extra rules. No permit is issued for a pool or spa over ground sloping 7:1 (14.3 percent) or steeper unless it uses a permanent non-chlorine water purification system, and such a pool must be pumped to the street when drained. In Subareas 1 and 3, drainage from roofs, pools and spas must reach an improved street by gravity unless LADBS finds that infeasible and approves another method, and a project that imports or exports more than 10 cubic yards of earth needs a soils and geology report that also addresses earthquake hazards, including the Charnock and Newport-Inglewood faults. Bluff parcels on streets such as Montreal Street and Sunridge Street also sit inside the City's mapped Hillside Grading Area, where a pool excavation needs its own grading permit. The bluff, lagoon and beach areas are in the coastal zone, and because the City has no certified Local Coastal Program for Westchester-Playa del Rey, any required coastal development permit must be found consistent with Chapter 3 of the Coastal Act. Parcels in the dual permit jurisdiction area also need a second coastal development permit from the California Coastal Commission. We prepare the drawings, make the submittal and handle plan-check corrections ourselves, so you are not the one chasing plan check.

What makes building in Playa del Rey different?

Recent City and Coastal Commission cases here involve lots of roughly 3,500 to 7,300 square feet, and on the Palisades del Rey bluffs many fall steeply away from the street. Below them sit the small village commercial strip along Culver Boulevard and The Jungle, a tight cluster of closely built apartments near the beach. One local condition that shapes the work: The bluffs are ancient wind-blown dunes, and the state seismic hazard map places their steepest faces in a zone of required investigation for earthquake-induced landslides.

Which parts of Playa del Rey do you work in?

All of it, including Palisades del Rey, Del Rey Hills, The Jungle and Del Rey Lagoon. Our crews run every job out of our Cahuenga Pass base in Los Angeles, with our own people on site.

What does a backyard or outdoor living project cost in Playa del Rey?

Full backyard transformation: generally $50,000 to $250,000+ across Southern California. What moves it is how much hardscape is involved, whether a pool or outdoor kitchen is included, grading and retaining, and the level of lighting and planting. We give line-item pricing after seeing the site rather than quoting a number over the phone.

How long does a backyard remodel take?

A patio and turf refresh often finishes in three to five weeks. A full transformation with hardscape, an outdoor kitchen, structures and lighting typically runs ten to sixteen weeks, and longer if a pool is part of the same phase.

Pavers or poured concrete?

Pavers cost more up front but flex with ground movement instead of cracking, and individual units can be lifted and replaced. Poured concrete is cheaper initially, but a crack means cutting out and repouring a section that rarely matches. On most Southern California soil we recommend pavers for anything you will look at every day.

Can you fix drainage at the same time?

Yes, and on most projects we insist on it. Correcting grade and adding proper drainage while the yard is already open is far cheaper than retrofitting it after new hardscape is down.

Do you handle the whole yard in one project?

Yes. Design, permits, hardscape, structures, kitchen, lighting and planting run through one team and one project manager, so nothing gets lost between trades.

Planning a backyard or outdoor living project in Playa del Rey?

Sit down with your project manager, go through the details, and get an accurate estimate for your property. We call you back within one business day.

Licensed, bonded & insured · CSLB license #1119054